Issue - meetings

Bankside- Provision of Newly Built School

Meeting: 16/07/2008 - Executive Board (Item 39)

39 Bankside Primary School - Provision of Newly Built School pdf icon PDF 55 KB

To consider the report of the Chief Executive of Education Leeds on the principle of the proposed demolition of the existing Bankside Primary School with a rebuild on the current site subject to later consideration of a detailed design and cost report by this Board.

 

Minutes:

The Chief Executive of Education Leeds submitted a report on the principle of the proposed demolition of the existing Bankside Primary School with a rebuild on the current site subject to later consideration of a detailed design and cost report by this Board.

 

RESOLVED – That the content of the report in detailing the proposed scheme be noted and that approval in principle be given to the rebuilding of Bankside Primary School, subject to a design and cost report being brought to a future meeting of this Board.

 

(Under the provisions of Council Procedure Rule 16.5 Councillor Wakefield required it to be recorded that he abstained from voting on this decision)