The Chief Officer (Highways and
Transportation):
i) noted the highway works as outlined in Section 3.1 and indicated
on drawing reference: E06/4165/043C;
ii) gave authority to negotiate the terms of and enter into a minor
agreement with the developer under the provisions of Section 278 of
the Highways Act 1980, whereby the works associated with the
development are carried out by the Developer at the full cost of
the developer, and the design checked and construction inspected by
the Council (with the power to intervene if necessary);
iii) gave authority to implement the works as set out in Section
3.1;
iv) approved an injection of £16,000 into the City
Development Department Capital Programme comprising £10,000
staff fees to check and inspect the highway works, and £6,000
to prepare, advertise, make and seal the TRO, all to be fully
funded by the developer;
v) gave authority to incur expenditure of £10,000 staff costs
and £6,000 legal costs, all to be fully rechargeable to the
developer from a Section 278 agreement;
vi) instructed the City Solicitor to draft and advertise two
Traffic Regulation Orders for No Waiting at Any Time and a
Prohibition of Motor Vehicles restriction, and a 20MPH Speed Limit
Order all as indicated on drawing no. E06/4165/043C and if no valid
objections are received to make, seal and implement the Orders as
advertised; and advertise a notice under Section 90c of the
Highways Act 1980 to provide traffic calming measures as shown on
the drawing nnumber. E06/4165/043C and if no valid objections are
received, to introduce the traffic calming measures as
advertisedgave authority to increase the adopted highway boundary
area to that shown on drawing ref. E06/4165/043C and for this area
to be fully recorded in the Council’s adopted highway
registry.