Decisions

Details of officer decisions relating to planning applications.

Decisions published

03/07/2015 - Approval of Sub-Delegation Scheme ref: 42506    For Determination

Decision Maker: City Solicitor

Decision published: 03/07/2015

Effective from:

Decision:

The City Solicitor has approved the sub-delegation scheme as described in and set out as Appendix 1 to the attached report.

Lead officer: Clare Millington


02/07/2015 - Right to Buy – Policy (Leasehold Flats) – Roof Space ref: 42505    For Determination

Decision Maker: Director of Environment and Housing

Decision published: 02/07/2015

Effective from:

Decision:

The Director of Environment and Housing agreed to approve

That requests by leaseholders of flats to acquire the roof space under leasehold terms are considered on their own merits.

That such requests are considered by the Head of Strategy and Development taking into consideration the future impact the sale may have on the Council.

Leaseholders are to meet all the Councils reasonable costs incurred in processing a case.

Fees by a leaseholder are not refunded where the Council has incurred costs for work/services carried out, irrespective of whether the request is refused.

Wards affected: (All Wards);

Lead officer: Cliff Allsopp


02/07/2015 - Replacement of roof at Chapletown Children's Centre ref: 42504    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 02/07/2015

Effective from:

Decision:

The Chief Officer Civic Enterprise Leeds (CEL) gave Authority to spend £110,000 to replace the damaged roof covering at Chapletown Children's centre which should ensure the suitability of the facility for use in the foreseeable future.

Wards affected: Chapel Allerton;

Lead officer: Frank Rounding


02/07/2015 - Passenger Transport - Approval to award three call off contracts from the Taxi and Private hire framework arrangement 2015-16. ref: 42503    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 02/07/2015

Effective from:

Decision:

The Chief Officer, Civic Enterprise Leeds approved the award of the
following home to school contacts from the framework arrangement for
Taxi and Private hire from 10th July 2015:-
a) A contract in order to provide home to school transport for the
North East SILC, West Oaks, for Children and young people who
have special educational needs to Rollinson Safeway, at a cost of
£192k per annum for a one year contract, with the option to
extend for one further year.
b) A mini framework contract for home to school transport for
Children and young people who have special educational needs
attending Hallcliffe school, to those suppliers detailed in appendix
A. The costs will depend on volume and home address of the
children and young people, but the total cost for transport into the
school is expected to be in excess of £250k per annum. The mini
framework will operate for one year.
c) A contract for one provider to provide home to school transport in
the North of the City for Children and young people who are
looked after by Leeds, to Rollinson Safeway. The estimated
budget for this call off, based on existing demand and volume is
approx. £300k per annum and the contract will be for two years
with a possible extension of a further two years

Wards affected: (All Wards);

Lead officer: Julie Hatton


02/07/2015 - Tender Acceptance Report: Birchfield Primary School Capital Scheme Number: 32232 RFG 000 ref: 42501    For Determination

Decision Maker: Director of Children's Services

Decision published: 02/07/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by Roofing Consultants Ltd in the sum of £202,238.00 to carry out roofing works at Birchfield Primary School.

Wards affected: Morley North;

Lead officer: Robert Thirtle


01/07/2015 - Award of contract to Hebe Works Ltd for licencing and development of Leeds Data Mill ref: 42499    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 01/07/2015

Effective from:

Decision:

The Chief Information Officer is recommended to award a contract to HeBe Works Ltd to develop the open data platform (The Data Mill) with other public bodies and support the Leeds version of this platform (The Leeds Data Mill) using the EU Negotiated Procedure without prior publication of a contract notice.

Lead officer: Ian Jones


01/07/2015 - Sites for Disposal through the HCA Delivery Partner Panel ref: 42498    For Determination

Decision Maker: Director of City Development

Decision published: 01/07/2015

Effective from:

Decision:

It was agreed that:

I. the sites included in this report and shown on the plan at appendix 1 are declared surplus to the Council’s requirements; and

II. the Brooklands Avenue, Cartmell Drive, Rathmell Road, Beckhill Approach and Beckhill Grove sites are included in the programme for disposal via the DPP alongside sites previously agreed at Executive Board on 19th November 2014; and

III. the sites are marketed via the Delivery Partner Panel for disposal as set out in the report and confidential appendix 2. Tenders received will be reported to the Director of City Development for consideration, with a recommendation for approval.

Wards affected: Chapel Allerton; Killingbeck and Seacroft; Temple Newsam;

Lead officer: Christa Smith


15/07/2015 - Award of contract to ODI Leeds to support and develop Open Data solutions ref: 42500    Recommendations Approved

Decision Maker: Deputy Chief Executive

Decision published: 01/07/2015

Effective from: 15/07/2015

Decision:

The Chief Information Officer is recommended to approve the waiver of CPRs 8.1 and 8.2 and enter into a contract and partnership with ODI Leeds to support and develop Open Data solutions aimed at delivering a Platform for transparency and accountability, efficiency and improved service delivery, innovation and value creation.

Lead officer: Ian Jones


30/06/2015 - Authorisation of Commercial Transfer Agreement - Holy Name Catholic Primary School from Leeds City Council to The Bishop Wheeler Academies Trust ref: 42497    For Determination

Decision Maker: Director of Children's Services

Decision published: 30/06/2015

Effective from:

Decision:

The Deputy Director of Children's Services (Learning) agreed to:
* note the negotiations held with solicitirs acting on behalf of the school, DfE and the Academy Trust;
* give authoirty for the Commercial Transfer Agreement to be executed and completed to enable the Academy to open 1st August 2015.

Wards affected: Weetwood;

Lead officer: Nigel Wilson


30/06/2015 - Appointments to Committees, Boards and Panels in consultation with relevant Group Whips. ref: 42496    For Determination

Decision Maker: City Solicitor

Decision published: 30/06/2015

Effective from:

Decision:

That the following Councillors be appointed as set out below:-
Councillor Sharon Hamilton to replace Councillor Graham Hyde
on the Housing Advisory Board

Lead officer: Kevin Tomkinson


29/06/2015 - Tender Acceptance Report: Bramhope Primary School Capital Scheme Number: 32232 RFG 000 ref: 42495    For Determination

Decision Maker: Director of Children's Services

Decision published: 29/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by Roofing Consultants Ltd in the sum of £186,918.00 to carry out roofing works at Bramhope Primary School.

Wards affected: Adel and Wharfedale;

Lead officer: Robert Thirtle


29/06/2015 - Response to Deputation - South Horsforth Residents ref: 42494    For Determination

Decision Maker: Director of City Development

Decision published: 29/06/2015

Effective from:

Decision:

The Director of City Development has noted the content of the report in consultation with the Executive Member for Regeneration, Transport and Planning.

Wards affected: Horsforth;

Lead officer: Lois Pickering


26/06/2015 - To commence a procurement exercise to secure a contract for the supply of fresh bread and morning goods for Leeds City Council. ref: 42492    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 26/06/2015

Effective from:

Decision:

The chief officer civic Enterprise Leeds approved the commencement
of a procurement exercise to secure a contract for the supply of fresh
bread and morning goods for Leeds City Council.

Wards affected: (All Wards);

Lead officer: Gillian Banks


26/06/2015 - Tender Acceptance Report: Raynville Primary School Capital Scheme Number : 32232 RFG 000 ref: 42490    For Determination

Decision Maker: Director of Children's Services

Decision published: 26/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by MITIE Tilley Roofing Ltd in the sum of £101,680.61 to carry out roofing works at Raynville Primary School.

Wards affected: Armley;

Lead officer: Robert Thirtle


26/06/2015 - Tender Acceptance Report: Hunslet Moor Primary School Capital Scheme Number: 32232 RFG 000 ref: 42489    For Determination

Decision Maker: Director of Children's Services

Decision published: 26/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by Clonshall Ltd in the sum of £149,471.20 to carry out roofing works at Hunslet Moor Primary School.

Wards affected: City and Hunslet;

Lead officer: Robert Thirtle


26/06/2015 - Design & Cost Report for the Basic Need 2015 Bulge Cohort - Bramley Primary & Scholes Primary School modular unit relocation. Capital Scheme Number: 16981/BGE/BSC ref: 42488    For Determination

Decision Maker: Director of Children's Services

Decision published: 26/06/2015

Effective from:

Decision:

The Programme Manager, Built Environment authorised expenditure of £232,233 from capital scheme number 16981/BGE/BSC to enable the relocation of two existing double classroom modular buildings, ownded by rthe Authority and currently in use on a temporary basis as St. Oswald's and Little London Primary Schools, to Bramley Primary School and Scholes (Elmet) Primary School. This includes any works associated with siting these buildings on the aforementioned sites.

Wards affected: Bramley and Stanningley; Harewood;

Lead officer: Christopher Gosling


06/07/2015 - To approve the Waiver of CPR 9.1 and 9.2 to enter into a new contract with YPO (without seeking further competition) for a period of two years. ref: 42491    

To approve the waiver of CPR 9.1 and 9.2 to purchase groceries and provisions for Leeds City Council establishments from YPO for a period of 2 years, with an estimated annual value of £2m.

Decision Maker: Deputy Chief Executive

Decision published: 26/06/2015

Effective from: 14/07/2015

Decision:

The Chief Officer Civic Enterprise Leeds approved the waiver of CPR 9.1 and 9.2 to enter into a new contract with the Y.P.O (without seeking further competition) for a period of two years.

Wards affected: (All Wards);

Lead officer: Mandy Snaith


25/06/2015 - Tender Acceptance Report: Kippax North Junior & Infant School Capital Scheme Number:32232 WIN 000 ref: 42487    For Determination

Decision Maker: Director of Children's Services

Decision published: 25/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by J Greenwood (Builders) Ltd in the sum of £24,574.00 to carry out window replacement works at Kippax North Junior & Infant School

Wards affected: Kippax and Methley;

Lead officer: Robert Thirtle


25/06/2015 - Tender Acceptance Report: Grange Farm Primary School Capital Scheme Number: 32232 RFG 000 ref: 42486    For Determination

Decision Maker: Director of Children's Services

Decision published: 25/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by Jennings Roofing Ltd in the sum of £101,504.00 to carry out roofing works at Grange Farm Primary School.

Wards affected: Killingbeck and Seacroft;

Lead officer: Robert Thirtle


25/06/2015 - Tender Acceptance Report: Shadwell Primary School Capital Scheme Number: 32232 RFG 000 ref: 42485    For Determination

Decision Maker: Director of Children's Services

Decision published: 25/06/2015

Effective from:

Decision:

The Built Environement Programme Manager accepted the tender supplied by Mac Roofing & Construction Ltd in the sum of £169,460.00 to carry out roofing works at Shadwell Primary School.

Wards affected: Harewood;

Lead officer: Robert Thirtle


25/06/2015 - Tender Acceptance Report: Churwell Primary School Capital Scheme Number: 32232 RFG 000 ref: 42484    For Determination

Decision Maker: Director of Children's Services

Decision published: 25/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by Clonshall Ltd in the sum of £153,178.68 to carry out roofing works at Churwell Primary School.

Wards affected: Morley North;

Lead officer: Robert Thirtle


25/06/2015 - Design & Cost Report for the Refurbishment of Barleyfields Community Centre, Wetherby to create a new Learning Disability Community Base ref: 42483    For Determination

Decision Maker: Director of Adult Social Services

Decision published: 25/06/2015

Effective from:

Decision:

The Director of Adult Social Services approved the incurring of expenditure of total of £175,000 on scheme 14997BAR/000 in line with the agreed programme of works.

The proposed timescale for the implementation of the decision is July 2015. The Senior Project Manager, Adult Social Care is responsible for implementing the decision

Wards affected: (All Wards);

Lead officer: Jane Charlton


25/06/2015 - Review of the decision to add for the Horse & Farrier, Bridge Street, Otley, LS21 1QB to the List of Assets of Community Value. ref: 42482    For Determination

Decision Maker: Director of City Development

Decision published: 25/06/2015

Effective from:

Decision:

The Director of City Development has reviewed the decision to add the Horse & Farrier, Bridge Street, Otley, LS21 1QB to the List of Assets of Community Value and decided that the asset should remain on the list.

Wards affected: Otley and Yeadon;

Lead officer: Neil Charlesworth


24/06/2015 - Holy Name RC Primary School, Otley Old Road, LS16 ref: 42481    For Determination

Decision Maker: Director of City Development

Decision published: 24/06/2015

Effective from:

Decision:

The Director of City Development has given approval to the granting of a lease of the playing fields at the site noted above to the Bishop Wheeler Catholic Academy Trust to enable it to run the school as an academy school in line with legislation and on the terms outlined within the report.

Wards affected: Weetwood;

Lead officer: Lesley Bryant


24/06/2015 - Tender Acceptance Report: Adel Primary School Capital Scheme Number: 32232 RFG 000 ref: 42480    For Determination

Decision Maker: Director of Children's Services

Decision published: 24/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by MITIE Tilley Ltd in the sum of £142,603.14 to carry out roofing works at Adel Primanry School.

Wards affected: Adel and Wharfedale;

Lead officer: Robert Thirtle


24/06/2015 - Tender Acceptance Report: Southroyd Primary School Capital Scheme Number: 32232 RFG 000 ref: 42479    For Determination

Decision Maker: Director of Children's Services

Decision published: 24/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied bu Mac Roofing & Contracting Ltd in the sum of £162,629.54 to carry out roofing works at Southroyd Primary School.

Wards affected: Pudsey;

Lead officer: Robert Thirtle


24/06/2015 - Tender Acceptance Report: Kerr Mackie Primary School Capital Scheme Number: 32232 RFG 000 ref: 42478    For Determination

Decision Maker: Director of Children's Services

Decision published: 24/06/2015

Effective from:

Decision:

The Built Environment Programme Manager accepted the tender supplied by SBS Roofinbg Ltd in the sum of £106,943 to carry out roofing works at Kerr Mackie Primary School.

Wards affected: Roundhay;

Lead officer: Robert Thirtle


24/06/2015 - The waiver of Contracts Procedure Rule 9.1 and 9.2 - to support the prompt relocation of existing modular accommodation to alternative educational sites. ref: 42476    For Determination

Decision Maker: Director of Children's Services

Decision published: 24/06/2015

Effective from:

Decision:

The Deputy Director – Learning appoved the waiver of the following Contract Procedure Rule(s):
• CPR 9.1 - Where no appropriate internal provider, exclusive supplier, existing provider, LCC approved framework agreement or approved framework agreement exists, competition is required for procurements valued over £100k.
• CPR 9.2 – Where there are sufficient numbers of providers at least four written tenders will be invited. Tenders must be invited by publishing an open opportunity on the YORtender portal or inviting tenders from suppliers using Constructionline (if applicable, please see the construction and housing category team for advice). Authorised Officers should consider CPR 1.1.3 when deciding which approach to take.
to approve the invitation of a single tender from Portakabin Ltd in order to remove the units from St Oswald’s Primary and Little London Primary and relocate to alternative educational sites to support the Basic Need bulge cohort programme. Subject to the satisfaction at the rates submitted, acceptance of the single tender for the sum of £188,460.00. It is received the contract shall commence on the 21st July 2015 and expire on the 28th August 2015 (with the option to extend for a period of 3 months, such option not to be taken up more than twice).

Wards affected: Bramley and Stanningley; Harewood;

Lead officer: Edward Staveley


24/06/2015 - Request to waive Contracts Procedure Rule 8 to utilise Smarter Solutions wiyjout competition for the provision of the ICT equipment at Broomfield South SILC. ref: 42475    For Determination

Decision Maker: Director of Children's Services

Decision published: 24/06/2015

Effective from:

Decision:

The Deputy Director - Learning approved the waiver of contracts procedure rule 8 to utilise Smarter Solutions for the supply and installation of ICT equipment (Interactive Classroom Display Solution, Internet Cafe PC's, Data Networking, Wireless & Switching & Multimedia equipment) at Broomfield South SILC from May 2015. The value of the decision is approximately £50k.

Wards affected: (All Wards);

Lead officer: Iain Dunn


24/06/2015 - Land and premises at Bristol Street Sheepscar - The New Roscoe Public House ref: 42474    For Determination

Decision Maker: Director of City Development

Decision published: 24/06/2015

Effective from:

Decision:

The Director of City Development approved a recommendation that the subject site be declared surplus to Council requirements and that Asset Management enter into negotiations with the existing tenant for a joint sale of the Council's freehold on the open market.

Wards affected: City and Hunslet;

Lead officer: Andrew Gledhill


24/06/2015 - Appointment to the West Yorkshire Combined Authority ref: 42473    For Determination

Decision Maker: Chief Executive

Decision published: 24/06/2015

Effective from:

Decision:

That the Chief Executive notes the wishes of the Conservative and Liberal Democrat Groups in West Yorkshire as follows:

WYCA Member Conservative Group

Councillor Andrew Carter (Leeds)
Councillor Stephen Baines (Calderdale)

Substitute

Councillor Simon Cooke (Bradford) for Councillor Andrew Carter (Leeds)
Councillor Nadeem Ahmed (Wakefield) for Councillor Stephen Baines (Calderdale)

WYCA Member Liberal Democrat Group

Councillor Jeanette Sunderland (Bradford)

Substitute

Councillor Stewart Golton (Leeds) for Councillor Jeanette Sunderland (Bradford)

And;
6.2Confirms the appointment of:
oCouncillor Andrew Carter to the West Yorkshire Combined Authority
oCouncillor Stewart Golton to the West Yorkshire Combined Authority as a substitute member for Councillor Jeanette Sunderland from Bradford Metropolitan District Council

Lead officer: Andy Hodson


29/06/2015 - Waiver of Contract Procedure Rules to award a contract for the provision of Secondary Learning Improvement Advisors by B11 Education Ltd. ref: 42477    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 24/06/2015

Effective from: 29/06/2015

Decision:

The Director of Children's Services approved the waiver of the following Contracts Procedure Rule(s):
Contracts Procedure Rules No 9.1 and 9.2 - High value procurements
and award a contract to B11 to a maximum contract value of £106,400. The contract shall commence on the 1st July 2015 sand expire on the 31st August 2016 with no further need to extend.

Wards affected: (All Wards);

Lead officer: Daniel Clark


23/06/2015 - Design & Cost Report for Raynville Primary School - Basic Need 2015 Bulge Cohort Capital Scheme Number: 16981/BGE/RPS ref: 42472    For Determination

Decision Maker: Director of Children's Services

Decision published: 23/06/2015

Effective from:

Decision:

The Built Environment Programme Manager agreed to:
* authorise expenditure of £166,629 from capital scheme number 16981/BGE/RPS to enable the proposed works at Raynville Primary School;
* note the programme dates identified in section 4.2 of the attached report on relation to the implementation of the decision. The final delivery date fo rhtis scheme is September 2015; and
* note that the officer responsible for implementation is the Built Environment Principal Development Officer.

Wards affected: Armley;

Lead officer: Christopher Gosling


23/06/2015 - Design & Cost Report for the Basic Need Bulge Cohort - Park Spring Primary School Capital Scheme Number: 16981/BGE/PSP ref: 42471    For Determination

Decision Maker: Director of Children's Services

Decision published: 23/06/2015

Effective from:

Decision:

The Programme Manager, Built Environment agreed to:
* authorise expenditure of £146,161 from capital scheme number 16981/BGE/PSP to enable the installation of temporary modular accommodation, including any necessary ancillary works, at Park Spring Primary School;
* note the programme dates identified in section 4.2 of the attached report in relation to the implementation of this decision. The final delivery date for this scheme is prior to the commencement of term September 2015; and
* note that the officer responsible for implementation is the Built Environment Principal Development Officer.

Wards affected: Pudsey;

Lead officer: Christopher Gosling


23/06/2015 - DEsign & Cost Report for the Basic Need Bulge Cohort - St Philip's Catholic Primary & Nursery School Capital Scheme Number: 16981/BGE/MSP ref: 42470    For Determination

Decision Maker: Director of Children's Services

Decision published: 23/06/2015

Effective from:

Decision:

The Programme Manager, Built Environment agreed to:
* Authorise expenditure of £124,542 from capital scheme number 16981/BGE/MSP to enable the installation of temporary modular accommodation, including any necessary ancillary works, at St Philip's Catholic Primary & Nursery School;
* note the programme dates identified in section 4.2 of the attached report in relation to implementation of this decision. The final delivery date for this scheme is prior to the commencement of term September 2015; and
* note that the officer responsible for implementation is the Built Environment Principal Development Officer

Wards affected: Middleton Park;

Lead officer: Christopher Gosling


23/06/2015 - Design & Cost Report for the Basic Need Bulge Cohort - Gledhow Primary School Capital Scheme Number: 16981/BGE/GPS ref: 42469    For Determination

Decision Maker: Director of Children's Services

Decision published: 23/06/2015

Effective from:

Decision:

The Programme Manager, Built Environment agreed to:
* authorise expenditure of £229,718 from capital scheme number 16981/BGE/GPS to enable the installation of temporary modular accommodation, including any necessary ancillary works, at Gledhow Primary School;
* note the programme dates identified in section 4.2 of the attached report in relation to the implementation of this decision. The final delivery date for this scheme is prior to the commencement of term September 2015; and
* note that the officer responsible for implementation is the Built Environment Principal Development Officer.

Wards affected: Roundhay;

Lead officer: Christopher Gosling


23/06/2015 - Design & Cost report for the Basic Need Bulge Cohort - Wigton Moor Primary School Capital Scheme Number : 16981/BGE/WMP ref: 42468    For Determination

Decision Maker: Director of Children's Services

Decision published: 23/06/2015

Effective from:

Decision:

The Programme Manager, Built Environment agreed to:
* authorise expenditure of £247,991 from capital scheme number 16981/BGE/WMP to enable the installation of temporary modular accommodation, including any necessary ancillary works, at Wigton Moor Primary School;
* note the programme dates identified in section 4.2 of the attached report in relation to the implementation of this decision. The final delivery date for this scheme is prior to the commencement of term September 2015; and
* note that the officer responsible in the Built Environment Principal Development Officer.

Wards affected: Alwoodley;

Lead officer: Christopher Gosling


23/06/2015 - Changing the Workplace – Civic Hall Stage 2 Priority Project 2nd and 3rd Floor East ref: 42467    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 23/06/2015

Effective from:

Decision:

The Deputy Chief Executive gave Authority to Spend of £189,636 in order to provide a fit for purpose work environment for 63 Strategy and Improvement staff and creation of a flexible work space for up to an additional 16, to allow cross council partnership working for the wider senior leadership team, locality leaders, staff working across breakthrough projects and supporting officers. This includes the refurbishment of the 2nd and 3rd floor east of the Civic Hall, the relocation of 44 of these staff and taking 63 staff through new ways of working (NWoW).

Lead officer: Nicola Buchan


23/06/2015 - Intelligent Council ref: 42466    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 23/06/2015

Effective from:

Decision:

In April 2015, a paper was taken to CLT reviewing the progress made in strengthening the council’s approach to intelligence across the council and how intelligence functions can be best arranged in the future to ensure a professional service that contributes to efficiencies the council is trying to achieve.
A key challenge in organising the intelligence function has been balancing the opportunities for integration, with the need to ensure Directorate’s priorities are catered for. As a result, in April 2015, CLT have endorsed an amended approach to the initiative that was originally agreed by CLT in April 2014. The new approach will maintain professional leadership in a single team leader.
To achieve this a matrix team approach will be established, with staff and budgets returning to original directorates and efficiencies included for the service allocated to Directorates.
It is envisaged that the matrix team will meet regularly with its primary focus on the core work programme, with clear roles, accountabilities and contributions agreed.
This approach will aim to capitalise on the closer working relationships built over the last 18 months by maintaining leadership in a single team leader and the agreement of core activity and responsibilities. It will be built around a common work programme to co-ordinate activity, providing common agreed outputs and a single point of access for key data and intelligence.
Arrangements have been made to return appropriate staff (and associated budgets) to their home Directorates from 1st July 2015. In terms of allocating the savings, the April BCDT agreed a formula based on allocation via a flat rate (£30k per Directorate) and relative size of intelligence function in Directorates as per the original BBM mapping exercise.

Lead officer: Simon Foy


22/06/2015 - Record of Decisions - Child Performance Licences, Child Chaperone Licenses and Children's Work Permits - May 2015 ref: 42465    For Determination

Decision Maker: Director of Children's Services

Decision published: 22/06/2015

Effective from:

Decision:

The Area Head of Targeted Services (ENE) agreed to publish the attached record of decisions made in May 2015.

Wards affected: (All Wards);

Lead officer: Ruth Kitson


22/06/2015 - Approval of Sub-Delegation Scheme ref: 42464    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 22/06/2015

Effective from:

Decision:

The Deputy Chief Executive has approved the sub-delegation scheme as described in and set out as Appendix 1 to the attached report.

Lead officer: Phillipa Toner


22/06/2015 - Design & Cost report for the Basic Need 2015 Bulge Cohort - Furniture Provision Capital Scheme Number: 16981/BGE/FUR ref: 42463    For Determination

Decision Maker: Director of Children's Services

Decision published: 22/06/2015

Effective from:

Decision:

The Head of Learning Systems agreed to:
* authorise expenditure of £188,390.82 from capital scheme number 16981/BGE/FUR to enable orders to be placed for furniture for the identified schools within the Basic Need 2015 Bulge Cohort Programme.
* note the programme dates identified in section 3.2 of this report in relation to the implementation of this decision. The final delivery date for this scheme is prior to the commencement of term September 2015.

Wards affected: Alwoodley; Armley; Bramley and Stanningley; Cross Gates and Whinmoor; Killingbeck and Seacroft; Kirkstall; Middleton Park; Moortown; Pudsey; Roundhay; Weetwood;

Lead officer: Christopher Gosling


22/06/2015 - Appointment to Outside Bodies - VARIOUS ref: 42462    For Determination

Decision Maker: City Solicitor

Decision published: 22/06/2015

Effective from:

Decision:

The Head of Governance Services is asked to approve the following appointments:
1 Yorkshire And Humber Local Authority Employers Association – Cllr Alison Lowe to continue
2 SIGOMA – Cllr G Hyde to replace whips nominee
3 LGA General Assembly – Cllr Blake to replace Cllr Wakefield
Cllr Finnigan to continue
Cllr J Procter to continue
Cllr Golton to continue
4 Combined Authority - Leeds District Consultation Committee
Councillor Urry to replace Whips nominee
Councillor A Khan replace Whips nominee
Councillor Wadsworth to continue
Councillor Campbell to continue

Lead officer: Kevin Tomkinson


19/06/2015 - Chilled water machine contract ref: 42461    For Determination

Decision Maker: Deputy Chief Executive

Decision published: 19/06/2015

Effective from:

Decision:

The Chief Officer Property and Fleet approved the waiver of CPR 7.1 to
extend the contract for the supply of chilled water machines for a 6
month period from July 2015.

Wards affected: (All Wards);

Lead officer: Les Reed


19/06/2015 - Award of the contract to clean windows to communal areas of Multi-storey flats ref: 42460    For Determination

Decision Maker: Director of Environment and Housing

Decision published: 19/06/2015

Effective from:

Decision:

To seek approval to award Cinderella Ltd the contract to clean windows to communal areas in Multi-storey flats 2015/2018

Wards affected: (All Wards);

Lead officer: Mick Field


26/06/2015 - Extension of the current interim contracts with Anchor and MHA under Contract Procedure Rule (CPR) 21.1 for 6 months to run from 1st October 2015 to 31st March 2016 ref: 42459    

The Director of Adult Social Services approved the extension of the current interim extra care contracts under CPR 21.1 for 6 months to run from 1st October 2015 to 31st March 2016. The values for the contracts are:

 

  • Extra Care Housing – Assisi Place and Yew Tree/Rosewood (YOR9J6DLT9Q9A) £348,168 for six months;
  • Extra Care Housing – The Laureates (YOR9J6D-52G5FV) £59,589 for six months.

 

The Commissioning Officer (Leeds ASC) will liaise with the Programmes, Projects and Procurement Unit to oversee the implementation of the extension of the existing arrangements before they expire on 30th September 2015. Both providers affected by this decision will be contacted to notify them of the extension.

 

Decision Maker: Director of Adult Social Services

Decision published: 18/06/2015

Effective from: 04/07/2015

Decision:

The Director of Adult Social Services approved the extension of the current interim extra care contracts under CPR 21.1 for 6 months to run from 1st October 2015 to 31st March 2016. The values for the contracts are:

 

  • Extra Care Housing – Assisi Place and Yew Tree/Rosewood (YOR9J6DLT9Q9A) £348,168 for six months;
  • Extra Care Housing – The Laureates (YOR9J6D-52G5FV) £59,589 for six months.

 

The Commissioning Officer (Leeds ASC) will liaise with the Programmes, Projects and Procurement Unit to oversee the implementation of the extension of the existing arrangements before they expire on 30th September 2015. Both providers affected by this decision will be contacted to notify them of the extension.

 

Wards affected: (All Wards);

Lead officer: David Peel


24/06/2015 - Leeds School Calendar 2016-17 & 2017-18 ref: 42447    

To agree the school calendar for community and voluntary controlled schools and SILCs for two academic years – 2016-2017 and 2017-2018.

Decision Maker: Director of Children's Services

Decision published: 16/06/2015

Effective from: 02/07/2015

Decision:

The Deputy Director – Learning approved the school calendar for academic years 2015-17 and 2017-18.

Wards affected: (All Wards);

Lead officer: Vicki White