Details of officer decisions relating to planning applications.
Decision Maker: Director of Communities, Housing & Environment
Decision published: 03/02/2023
Effective from:
Decision:
The Chief Officer Parks and Countryside
approved the waiver of Contract Procedure Rules 9.1 and 9.2
(‘over 100k – High Value Procurements’) to award
a contract to Grace & Tailor Ltd as the main production
contractor for the Leeds West Indian Carnival with a contract value
not exceeding £170,000
Wards affected: Chapel Allerton;
Lead officer: Dave Morgan
Decision Maker: Director of Communities, Housing & Environment
Decision published: 02/02/2023
Effective from:
Decision:
The Chief Officer Parks and Countryside
approved the waiver of Contract Procedure Rules 9.1 and 9.2
(‘over 100k – High Value Procurements’) to award
a contract to Grace & Tailor Ltd as the main production
contractor for the Leeds Black Music Festival with a contract value
not exceeding £150,000 between 18th July 2022 to 30th
September 2022.
Wards affected: Chapel Allerton;
Lead officer: Dave Morgan
Decision Maker: City Solicitor
Decision published: 02/02/2023
Effective from:
Decision:
Following the Significant Operational Decision
taken by the Director of City Development on the 26th October 2022,
authority to enter into the NEC4 Engineering and Construction
Option C Target Contract was delegated to the City Solicitor.
The City Solicitor:
a) Confirmed the decision taken by the Director of City Development
in October 2022 to enter into an NEC4 Engineering and Construction
Option C Target Cost contract with the Principal Contractor to
deliver the LSSTG project subject to the terms and conditions
outlined in the confidential appendix.
b) Approved entry into a designer’s collateral warranty with
consultants Atkins for the LSSTG design works.
The Key Decision which led to the decision from the Director of
City Development and the City Solicitor was taken at Executive
Board on the 22nd June 2022.
Wards affected: Beeston and Holbeck; Hunslet and Riverside;
Lead officer: Chloe Dummer
Decision Maker: Director of Resources
Decision published: 02/02/2023
Effective from: 16/02/2023
Decision:
The Chief Digital and Information Officer
approved the award of a contract to Fujitsu Services Ltd, on a time
and materials basis, for 12 months with the option to extend for a
further three months. The contract to commence as soon as
reasonably practicable following approval to proceed.
Wards affected: (All Wards);
Lead officer: Robert Greaves
Decision Maker: Director of City Development
Decision published: 02/02/2023
Effective from: 02/02/2023
Decision:
The Chief Officer (Highways and
Transportation) was requested to:
a. Consider and over-rule the objection raised to the proposed
Traffic Regulation Order “Leeds City Council (Traffic
Regulation) (Waiting Restrictions) (No.61) Order 2014 City &
Hunslet Ward TRO 2022 Amendment No.03 Order 2022”
b. Request the City Solicitor to make, seal and
implement the above order subject to amendment in accordance with
the revised TRO drawing attached at Appendix C of the
Report.
Wards affected: Hunslet and Riverside;
Lead officer: Panny Panesar
Authority to procure a Framework Agreement for the provision of transport services via taxi, hackney carriage, minibus and wheelchair accessible vehicles
Decision Maker: Director of Resources
Decision published: 02/02/2023
Effective from: 18/02/2023
Decision:
The Director of Resources gave authority to procure a new four-year Dynamic Purchasing System for the provision of home to school transport of SEND children, children who are in the care of the Authority, and adult day centre transport to commence from the June 2023 with an annual estimated spend of £9 million.
Wards affected: (All Wards);
Lead officer: Richard Jackson
Decision Maker: Director of City Development
Decision published: 01/02/2023
Effective from:
Decision:
The Chief Officer, Highways and
Transportation:
a) Noted the contents of this report and the terms of the related
funding agreement.
b) Agreed to enter in to a funding agreement with the West
Yorkshire Combined Authority for Shared Prosperity Fund monies with
a total value of £310,000 to deliver the West Yorkshire Flood
Innovation Programme ( WYFLIP) - Revenue & Research
Project.
Wards affected: (All Wards);
Lead officer: Jonathan Moxon
Decision Maker: Director of City Development
Decision published: 01/02/2023
Effective from:
Decision:
The Head of Engineering and
Infrastructure:
a) Noted the contents of this report and the terms of the related
partnership agreement.
b) Agreed to enter into a partnership agreement with the
Environment Agency (EA) with a total value of £250,000 to
deliver the Yorkshire Natural Flood Management Community of
Practice and West Yorkshire Flood Innovation Programme.
Wards affected: (All Wards);
Lead officer: Jonathan Moxon
Decision Maker: Director of City Development
Decision published: 01/02/2023
Effective from:
Decision:
The Chief Officer (Highways &
Transportation) was requested to approve the recommendation to
extend the Noise Insulation Contract for a further 12 months to 5th
February 2024 with the incumbent contractor, DGB Joinery Ltd. The
estimated cost of the 12-month extension is approximately
£200,000.00.
Wards affected: (All Wards);
Lead officer: Megan Chamberlain
Decision Maker: Director of City Development
Decision published: 01/02/2023
Effective from:
Decision:
The Chief Officer (Highway and Transportation)
was requested to approve the tender and evaluation of the Yorkshire
Highway Alliance Supply of Traffic Sign Poles Contract 2023 for a
2-year period with the option to extend for a further 2 years with
an estimated value of £125,000 per annum across West
Yorkshire.
Wards affected: (All Wards);
Lead officer: James Hirst
Decision Maker: Director of City Development
Decision published: 01/02/2023
Effective from:
Decision:
The Director of City Development has agreed
to:
a) Accept the UKSPF Funding Agreement from WYCA for a local
authority grant allocation of £9,769,280 over Years 2022
– 2025.
b) Authorise the Council to sign, seal and return the agreement to
WYCA legal team.
Wards affected: (All Wards);
Lead officer: Martyn Long
Decision Maker: Director of Communities, Housing & Environment
Decision published: 01/02/2023
Effective from:
Decision:
The Director of Communities, Housing and
Environment gave approval of the creation of three full-time fixed
term contract positions to provide operational support to
co-ordinate activities and services.
Wards affected: (All Wards);
Lead officer: Shaun Travis
Decision Maker: Director of City Development
Decision published: 31/01/2023
Effective from:
Decision:
The Head of Transport Planning:
a) Confirmed acceptance of additional development funding of
£450,000 from the Transforming Cities Fund to support project
development of the A61(S) corridor scheme to OBC completion.
b) Gave approval for Leeds City Council (LCC), to appoint WSP
professional consultancy services via West Yorkshire Combined
Authority (WYCA) Strategic Delivery Partner (SDP3) procurement
framework on a direct award to support project development to
Outline Business Case (OBC) in partnership with WMDC.
Wards affected: Ardsley and Robin Hood; Hunslet and Riverside; Rothwell;
Lead officer: Rupert Oldfield
Decision Maker: Director of Resources
Decision published: 31/01/2023
Effective from:
Decision:
The Chief Officer Civic Enterprise Leeds
approved:
(a) the injection of temporary staff resources up to a maximum of
£266,776 (Including a 10% contingency) made up of 2 PO6s and
a PO4 for up to 1 year to assist with residual issues around
Connect implementation, HR issues and Commercial issues supported
by 4 B3s for 6 months and
(b) that the expenditure is funded from the capital receipts
flexibilities provided for transformational work.
Wards affected: (All Wards);
Lead officer: Craig Simpson
Decision Maker: Director of City Development
Decision published: 31/01/2023
Effective from:
Decision:
The Head of Transport Planning:
a) Noted the contents of this report
b) Approved the direct award of a contract to Phar Partnerships
Limited, in order that they can identify a suitable sponsor for
Leeds City Bikes service.
Wards affected: (All Wards);
Lead officer: Lee Paton
Decision Maker: Director of Communities, Housing & Environment
Decision published: 31/01/2023
Effective from:
Decision:
The Natural Environment Manager authorised the
making of a Public Path Diversion Order under Town and Country
Planning Act 1990 Section 257 for the diversion of Leeds Public
Footpath 207 and permissive bridleway at Cockburn School and to
confirm the Order subject to their being no objections or in the
event of objections being received which cannot be withdrawn, for
the Order to be referred to the Secretary of State for the
Department of the Environment, Food and Rural Affairs for
determination.
Wards affected: (All Wards);
Lead officer: Charlotte Hamer
Decision Maker: Director of Children and Families
Decision published: 31/01/2023
Effective from:
Decision:
The Director of Children & Families
approved the decision to extend the contract with the current
provider of a targeted weekend activity scheme, LWCA. The extension
period is from 01/04/2023 to 31/03/2024. There is one further
12-month extension period remaining. The overall contract value,
should all extensions be utilised will be £420,000
(£140K per Annum).
Wards affected: Various;
Lead officer: Emma Belaid
Decision Maker: Director of City Development
Decision published: 31/01/2023
Effective from: 31/01/2023
Decision:
The Head of Transport Planning:
a) Confirmed acceptance of additional development funding of
£450,000 from the Transforming Cities Fund to support project
development of the A639 corridor scheme to OBC completion.
b) Gave approval for Leeds City Council (LCC), to appoint WSP
professional consultancy services via West Yorkshire Combined
Authority (WYCA) Strategic Delivery Partner (SDP3) procurement
framework on a direct award to support project development to
Outline Business Case (OBC) in partnership with WMDC.
Wards affected: Hunslet and Riverside; Kippax and Methley; Rothwell;
Lead officer: Rupert Oldfield
Decision Maker: Director of Communities, Housing & Environment
Decision published: 27/01/2023
Effective from:
Decision:
The Director of Communities, Housing and
Environment has:-
a) Approved the use of 1x12 month extension provision for contract
DN192869/9V6C-XSVTXL. The contract is with Liberty Gas Group for
Gas Fuelled Domestic Heating Lot 3 (West Leeds) with the proposed
extension anticipated to commence on 1st April 2023 until 31st
March 2024, at an estimated value of £3million per annum;
and
b) Approved the use of 1x12 month extension provision for contract
DN198406/A7VL-87D9E5. The contract is with Liberty Gas Group for
Gas Fuelled Domestic Heating and covers the Outer Northwest Leeds
area with the proposed extension commencing on 1st April 2023 until
31st March 2024, at an estimated value of £1.5million per
annum.
Wards affected: (All Wards);
Lead officer: Andrew Ball
Approval to award from existing DPS DN448278;
- Garden and food - call off from existing Dynamic purchasing system which provides the service of recycling garden waste collected at the kerbside and Household Waste Recycling Centres. (£1.2m p/a)
Decision Maker: Director of Communities, Housing & Environment
Decision published: 27/01/2023
Effective from: 14/02/2023
Decision:
The Chief Officer for Environmental Services under CPR 3.1.7 and 3.1.8 approves commencing a second further competition exercise under the Garden and Food Waste Recycling DPS (DN448278) using the process outlined in the attached report and the evaluation criteria that has been specified. The Call Off contract will run from 1st May 2023 until 30th April 2029 and has an annual estimated value of £1.1m.
Wards affected: (All Wards);
Lead officer: Rosie Harvey
Authority to procure and award a supply contract for plastic 240lt wheeled bins through a Call Off from ESPO Framework 860-22
Decision Maker: Director of Communities, Housing & Environment
Decision published: 27/01/2023
Effective from: 14/02/2023
Decision:
The Chief Officer for Environmental Services approves the appointment of One51 ES Plastics UK Limited T/A MGB Plastics under contract 60180 240lt Plastic Wheeled Bin Supply Contract, Call Off from ESPO Framework 860-22 Refise and Recycling Products (including wheeled bins). The contract will run from 1st December 2022 until 30th November 2023 with options to extend by 2x12 months. The approximate total value including extension options is £1.4 million.
Wards affected: (All Wards);
Lead officer: Rosie Harvey
Decision Maker: Director of City Development
Decision published: 26/01/2023
Effective from:
Decision:
The Chief Officer Asset Management and
Regeneration has declared Hunslet Hall surplus to Council
requirements and approved its sale by on the open market by way of
public auction.
Wards affected: Hunslet and Riverside;
Lead officer: Richard Bracey
Decision Maker: Director of City Development
Decision published: 26/01/2023
Effective from:
Decision:
The Chief Officer Asset Management &
Regeneration has approved terms
for the purchase of land at Wyther Lane for the development by
Leeds City Council of a pumping station as part of the approved
Flood Alleviation Scheme Phase 2.
Wards affected: Armley;
Lead officer: Richard Bracey
Decision Maker: Director of City Development
Decision published: 26/01/2023
Effective from:
Decision:
The Chief Officer Asset Management &
Regeneration:
1. Granted approval to purchase the properties detailed in
Confidential Appendix B, at Market Value as determined by Land
& Property and authorised their use as designated Rough Sleeper
accommodation, to be managed by Leeds Housing Options.
2. Authorised the required expenditure to enable the programme to
progress the property acquisitions detailed in Confidential
Appendix B. These property acquisitions will be funded from the
Council Housing Growth Programme budget, via a combination of
Housing Revenue Account (HRA) borrowing and a Homes England grant
of £50,000 per property.
3. Noted that Executive Board granted Authority to Spend for the
programme on 24th July 2019.
4. Noted that written approval to bring the properties back into
council housing stock was provided by the Chief Officer (Housing)
of Communities, Housing & Environment on 5th December
2022.
Wards affected: Cross Gates and Whinmoor; Killingbeck and Seacroft;
Lead officer: Liam Riley
Decision Maker: Director of Resources
Decision published: 26/01/2023
Effective from:
Decision:
The Chief Officer Civic Enterprise Leeds
approved under regulation 72 1(e) the variation of the end date of
contract 25203 for the supply of frozen foods, The contract end
date is to be varied from 31 March 2023 to 31 July 2023 with an
estimated value under £450,000.
Wards affected: Various;
Lead officer: Mandy Snaith
Decision Maker: Director of Public Health
Decision published: 26/01/2023
Effective from:
Decision:
The Director of Public Health has agreed to award a contract to
Humankind Charity with effect from 1st April 2023 until 31st March
2028, with an option to extend for up to a further 60 months in any
combination.
The value of this decision is £87,916,105.78 for the initial
5-year contract period (total value of £176,285,266.17 if the
extension is fully utilised), which will be subject to a separate
decision at the appropriate time. (This is a direct consequence of
a previous key decision).
Wards affected: (All Wards);
Lead officer: Eleanor Clark
Decision Maker: Director of Children and Families
Decision published: 26/01/2023
Effective from:
Decision:
The Chief Officer, Resources and Strategy
approved the variation of contract reference DN317731 Children and
Families Bereavement Service with Child Bereavement UK to vary the
extension period from 12 to 24 months and agreed to take up the
full new extension period. The new extension period is for 24
months from 1st March 2023 to 28th February 2025 at a value of
£266,894 (£133,447 p.a)
Wards affected: Various;
Lead officer: Catherine Henderson
Decision Maker: Director of City Development
Decision published: 25/01/2023
Effective from:
Decision:
The Chief Officer Operations and Active
Leeds
- Approved a contract award for Legible Leeds Wayfinding Extension
2023-2026 to IS Consultancy (UK) Ltd commencing on 1st April 2023
on a call-off basis at an estimated total contract value of up to
£217,500 over the contract term.
Wards affected: Beeston and Holbeck; Hunslet and Riverside; Little London and Woodhouse;
Lead officer: Richard Sadler
Decision Maker: Director of City Development
Decision published: 25/01/2023
Effective from:
Decision:
The Chief Officer Asset Management and
Regeneration has approved the making of the financial settlement to
the Diocese as detailed in the confidential appendix in settlement
of the reverter requirements and related site security costs and to
the incurring of the expenditure required to settle the amount
due.
Wards affected: Cross Gates and Whinmoor;
Lead officer: Martin Blackett
Decision Maker: Director of Communities, Housing & Environment
Decision published: 25/01/2023
Effective from:
Decision:
The Director of Communities, Housing and
Environment approved the use of a Department for Levelling Up,
Housing and Communities (DLUHC) Rough Sleeping Accommodation
Programme (RSAP5) grant to Turning Lives Around (TLA) to provide
four units of one bedroom accommodation with support for people who
have previously been rough sleeping. The grant available is for up
to £34,875 revenue and up to £204,000
capital.
Wards affected: (All Wards);
Lead officer: Julie Staton
Brief Description |
To accept the allocation of £1,662,116 from the DLUHC Council Tax Support Fund to support economically vulnerable households in with council tax payments from 1st April 2023 to 31st March 2024. To accept the proposed method of distributing the CTSF outlined in the accompanying report. |
Impact On Wards |
The Council Tax Support Fund will support economically vulnerable households across the city with council tax payments.
|
Financial and procurement implications |
Funding from Government will total £1,662,116 and this will be distributed across Council Tax Support Recipients in Leeds. |
Partnership working |
N/A |
Decision Maker: Director of Communities, Housing & Environment
Decision published: 25/01/2023
Effective from: 02/02/2023
Decision:
The Director of Communities, Housing and Environment has agreed to:-
Wards affected: (All Wards);
Lead officer: David Fryer
Decision Maker: Director of Children and Families
Decision published: 24/01/2023
Effective from:
Decision:
The Chief Officer, Resources & Strategy
agreed to transfer £428,630 Department for Levelling Up,
Housing and Communities Grant Funding to Bradford Metropolitan
District Council for the purposes of the fulfilling requirements of
our shared bid to the DLUHC Data Accelerator Fund.
Wards affected: Various;
Lead officer: Lyndsey Mortimer
Decision Maker: Director of Adults and Health
Decision published: 24/01/2023
Effective from: 24/01/2023
Decision:
The Deputy Director of Social Work and Social Care Services has approved:-
A) The request to increase the cost of the existing Laundry and Linen service in line with CPI.
B) To amend the existing contract specification to include the supply and launder of face cloths.
This decision relates to contract 47610 for which the extension has been approved (D55971). During the contract extension negotiations the contractor Elis UK Ltd have requested an increase in line with the annual CPI rate (10.1%). This is due to increased operating costs with a Textile Services Cost Index (TSCI) increase of 17.33%.
Wards affected: (All Wards);
Lead officer: Karla Gallon
To vary the existing contract with Continental Landscapes under Public Contracts Regulations 2015 72 (1) (b) to extend the contract term for a two-year period from the end of the existing contract until 31st December 2026
Decision Maker: Director of Communities, Housing & Environment
Decision published: 19/01/2023
Effective from: 04/02/2023
Decision:
The Chief Officer Parks and Countryside gave approval to vary the existing contract with Continental Landscapes Ltd under Public Contracts Regulations 2015 72 (1) (b) forthwith to extend the contract term for a two-year period from the end of the existing contract until 31st December 2026.
Wards affected: (All Wards);
Lead officer: Simon Frosdick
Adoption of Transport Supplementary Planning Document (SPD) and revocation / withdrawal of 4 existing adopted SPD’s it replaces. The SPD’s to be revoked / withdrawn include: Street Design Guide SPD; Travel Plans SPD; Parking SPD and Public Transport Developer Contributions SPD.
Decision Maker: Chief Planning Officer
Decision published: 19/01/2023
Effective from: 04/02/2023
Decision:
The Chief Planning Officer
a) Noted the second-round consultation comments and LCC response to these matters.
b) Subject to consultation with Executive Member, adopted the Transport SPD as attached at Appendix B (noting that graphic design will follow).
c) Revoked four existing SPD’s which have been superseded by the Transport SPD:
Street Design Guide SPD;
Parking SPD;
Travel Plans SPD;
Public Transport Developer Contributions SPD
Wards affected: (All Wards);
Lead officer: Gillian Macleod