Decisions

Details of officer decisions relating to planning applications.

Decisions published

07/12/2022 - Deputy and Estates Team Service Review ref: 55884    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 07/12/2022

Effective from:

Decision:

The Deputy Director of Social Work and Social Care Service has noted/approved -

Not to pursue the introduction of charges where we are the Corporate Appointee.

To become the Corporate Deputy for 330 eligible clients, for whom we’re currently Corporate Appointee.

To implement associated charges per the charging policy as set out by the Court of Protection Practice Direction B for being a Corporate Deputy, bringing in £288k per annum once fully operational.

As part of the invest to save model, and to facilitate implementing this change, approved the recruitment of 4 FTEs to the Deputy and Estates Team.

Wards affected: (All Wards);

Lead officer: John Crowther


07/12/2022 - Approval to extend the Community Based Short Breaks Contracts (DN387293) ref: 55883    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 07/12/2022

Effective from:

Decision:


The Deputy Director of Social Work and Social Care Service has approved a 24-month extension of the current contracts for community based short breaks contracts (DN387293) with the extension commencing on 1st April 2023 at an indicative contract value of £2,402,460 across all providers on the agreement for the 24 months period. The providers are Allied Healthcare, Carers Trust Mid Yorkshire, Meridian (previously Synergy) and Springfield Healthcare.

The Deputy Director of Social Work and Social Care Service has noted that throughout the extension period, Adults and Health will continue to develop and test the Community Wellbeing Model as part of its transformation of home care, and consideration will be given to the inclusion of community based short breaks within that model.
The Deputy Director of Social Work and Social Care Service has noted that the Head of Service (Integrated Commissioning) will be responsible for implementing the decision with support from Procurement and Commercial Services and Financial Services.

The Deputy Director of Social Work and Social Care Service has noted budget based on estimate expenditure in 23/24 and 24/25 to be moved from Adult Carers budget to Social Work and Social Care from 1st April 2023.

Wards affected: (All Wards);

Lead officer: Ian Brooke-Mawson


07/12/2022 - Authority to incorporate 12 bungalows into the procurement of an extra care support service for the Housing Leeds Middleton site scheduled to open Autumn 2023 ref: 55882    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 07/12/2022

Effective from:

Decision:


The Deputy Director of Social Work and Social Care Service has approved the addition of the 12 bungalows at the Middleton site to the wider procurement of extra care support services for the scheme based on the reasons presented in this report. Once approved commissioning officers will commence procurement at the earliest opportunity with the view to awarding contract from the 1st July 2023. This contract will run until 30th June 2026 with the option to extend for a further period of up to 24 months in any combination. Expenditure of £20 per annum will be incurred by the Council as part of the contract arrangement to provide direct financial consideration between Adult Social Care and the eventual service provider. The inclusion of the bungalows is estimated to add a further £87,746.39 to the potential annual income for any selected provider. This will be achieved through charges for planned care and support for which Adult Social Care (ASC) may be liable for up to 100% of the cost. This expenditure would take the form of Council contributions towards individual care costs following a financial assessment and falls under the Council’s statutory duties as defined in the Care Act 2014.

The Deputy Director of Social Work and Social Care Service has noted that officers on behalf of Adults and Health Integrated Commissioning and Procurement and Commercial Services will complete all the actions necessary to ensure the arrangements for the bungalows and wider extra care site are completed and a contract is in place for the 1st of July 2023, including suitable lead-in time.

Wards affected: (All Wards);

Lead officer: David Peel


07/12/2022 - Appointments to West Yorkshire Combined Authority (WYCA) Committees ref: 55881    Recommendations Approved

Decision Maker: Chief Executive

Decision published: 07/12/2022

Effective from:

Decision:

At the Annual Council Meeting delegated authority was given to the Chief Executive to provide additional nominations, or to revise existing nominations, as required by WYCA in consultation with group whips.
Following the resignation of a Labour Group Member from the West Yorkshire Combined Authority Transport Committee the Combined Authority require a replacement Engagement Lead Member appointing to that Committee.
Cllr Izaak Wilson to be appointed as the Engagement Lead role on the West Yorkshire Combined Authority Transport Committee

Wards affected: (All Wards);

Lead officer: Kevin Tomkinson


07/12/2022 - Clawback of Excess School Surplus Balances 2021/22 – Hugh Gaitskell ref: 55880    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 07/12/2022

Effective from:

Decision:

The Chief Officer Resources & Strategy approved the clawback of excess schools balance 2021/22 of £385,252 from Hugh Gatiskell Primary School.

Lead officer: Lucie McAulay


07/12/2022 - Mayoral Fund – Additional support for advice services & Warm Space funding ref: 55877    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 07/12/2022

Effective from:

Decision:

The Chief Officer Community Hubs, Welfare and Business Support gave approval to accept £323,950 funding from the West Yorkshire Mayoral Fund, to cover period November 2022 – April 2023.
The funding will be used in the following ways:
•£75k to Leeds Citizens Advice Bureau (CAB) to cover significant increase in costs (inflation, pay award, venue costs) in the Advice Contract; and
•£248,950 Remainder to Voluntary Action Leeds (VAL) to administer funding pots to the Leeds Warm Spaces network

Wards affected: (All Wards);

Lead officer: Nick Hart


06/12/2022 - Leeds Station Sustainable Travel Gateway Project – Advance Works contract extension and design and cost Approval ref: 55876    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 06/12/2022

Effective from:

Decision:

The Chief Officer Highways and Transportation;
a) Increased the scope of works of the Advance Works contract to include the refurbishment of units 17 and 18 on Dark Neville Street and the soft strip of the former Shababs restaurant.
b) Extended the Advance Works contract programme to include the above works and also extend the traffic management arrangements as a result of the utilities diversions works on Bishopgate Street incurred as a result of delays in statutory undertaker availability.
c) Approved the Neville Street and Bishopgate Street lighting and cladding designs and CCTV column design, noting that the lighting on Bishopgate Street will be delivered as part of the main works.
d) Provided approval to accept the decorative lighting on Neville Street as a new LCC asset to be maintained by Street Lighting and funded from the monies originally allocated for the cladding on Neville Street which will become a Network Rail asset upon completion of the Neville Street works.
e) Provided authority to vary the contract under Contract Procedure Rule 21.7 to increase the value of the Advanced Works contract in accordance with Rule 10 of the Financial Regulations to deliver the Neville Street lighting and cladding works, the refurbishment of units 17 and 18 on Dark Neville Street, drainage works and the soft strip of the former Shababs restaurant. The total cost of the Advance Works contract is now £3.76m of which £2.89m was previously approved in April 2022.
f) Injected authority to spend of £10.451m as a result of inflationary cost increases to the target cost of the main works funded by WYCA Transforming Cities Fund subject to final Combined Authority Committee approval on the 8th December 2022.

Wards affected: Beeston and Holbeck; Hunslet and Riverside;

Lead officer: Chloe Dummer


06/12/2022 - Amalgamation of Little Owls Day care settings ref: 55878    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 06/12/2022

Effective from: 06/12/2022

Decision:

That the Director of Children and Families approves the amalgamation of the following Little Owls Day care settings;
Armley Chapel Lane to Armley Moor
Richmond Hill to Osmondthorpe
Dewsbury Road to New Bewerley and City & Holbeck
Middleton Over 3’s to Middleton Laurel Bank

Wards affected: Various;

Lead officer: Vicky Fuggles


05/12/2022 - Section 278 highway works associated with demolition of derelict buildings, conversion of former industrial buildings to retail and office use, construction of care home, retail units, six residential units and new pay and display car park, A659 West ref: 55875    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 05/12/2022

Effective from:

Decision:

The Chief Officer (Highways and Transportation);
a) Noted the detail of the highway works as set out in paragraphs 1-8 in the Design and Cost report and as shown on the plan included at Appendix 4;
b) Gave authority to negotiate the terms of and enter into an agreement with the developer under the provisions of Section 278 of the Highways Act 1980; with the works to be designed and implemented by the City Council on behalf of the developer;
c) Requested the City Solicitor to revoke the existing Traffic Regulation Order (TRO) on the A659 Westgate in proximity of the proposed works and advertise a Draft TRO for ‘No Waiting at Any Time’; and if no valid objections are received, to make, seal and implement the Orders as advertised; and
d) Gave authority to incur capital expenditure of £1,480,000 consisting of £1,130,000 civil works costs, £190,000 staff fees and £160,000 commuted sums, all of which will be fully funded through the Section 278 agreement.

Wards affected: Otley and Yeadon;

Lead officer: Ahmad Huneidi


05/12/2022 - Section 278 highway works for a phased development of four residential buildings, townhouses and student accommodation with ground floor uses comprising retail, commercial, community, health, cultural and leisure with associated access, parking, land ref: 55874    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 05/12/2022

Effective from:

Decision:

The Chief Officer (Highways and Transportation);
a) Noted the detail of the highway works as set out in paragraphs 1-4 in the Design and Cost report and as shown on the plan included at Appendix 3;
b) Gave authority to negotiate the terms of and enter into an agreement with the developer under the provisions of Section 278 of the Highways Act 1980; with the highway scheme to be designed and implemented by the City Council on behalf of the developer;
c) Requested the City Solicitor to revoke the existing Traffic Regulation Order (TRO) on Kirkstall Road up to Willow Road / Viaduct Road junction and advertise a Draft TRO for 'No Loading at Any Time'; and if no valid objections are received, to make, seal and implement the new TRO as advertised; and
d) Gave authority to incur capital expenditure of £650,000 consisting of £500,000 civil works costs, £100,000 staff fees and £50,000 commuted sums, all of which will be fully funded through the Section 278 agreement.

Wards affected: Little London and Woodhouse;

Lead officer: Ahmad Huneidi


05/12/2022 - Procurement of Monitoring & Evaluation Services ref: 55873    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 05/12/2022

Effective from:

Decision:

The Chief Officer Operations and Active Leeds approved a high value procurement via an open procurement through Yortender in accordance with CPR9, in relation to a DFT funded Active Travel Social Prescribing Pilot. The procurement will be for a maximum fee of £150,000.

Wards affected: Burmantofts and Richmond Hill; Gipton and Harehills;

Lead officer: Judith Fox


05/12/2022 - To approve the contract for the supply of Beers, Wines, Spirits and Mixers ref: 55872    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 05/12/2022

Effective from: 05/12/2022

Decision:

The Chief Officer, Culture & Economy has approved the award on a contract for the supply of beers wines and spirits to Matthew Clark Bibendum Limited. The contract will commence on 1 January 2023 for a period of three years, with a possible 1 year + 1 year extension.

Wards affected: (All Wards);

Lead officer: Stuart Dornford-May


02/12/2022 - Council Housing Growth Programme – Rough Sleepers Accommodation Programme Property Purchases Batch 6 ref: 55871    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 02/12/2022

Effective from:

Decision:

The Director of City Development:
1. Granted approval to purchase the properties, detailed in Confidential Appendix B, at Market Value as determined by Land & Property and authorised their use as designated Rough Sleeper accommodation, to be managed by Leeds Housing Options.
2. Authorised the required expenditure to enable the programme to progress the property acquisitions detailed in Confidential Appendix B. These property acquisitions will be funded from the Council Housing Growth Programme budget, via a combination of Housing Revenue Account (HRA) borrowing and a Homes England grant of £50,000 per property.
3. Noted that Executive Board granted Authority to Spend for the programme on 24th July 2019.
4. Noted that written approval to bring the properties back into council housing stock was provided by the Chief Officer (Housing) of Communities, Housing & Environment on the 29th September 2022, 6thOctober 2022 and 13th October 2022.

Wards affected: Adel and Wharfedale; Beeston and Holbeck; Bramley and Stanningley;

Lead officer: Liam Riley


02/12/2022 - To provide a total of £1,110,000 from the Household Support Fund to the Leeds Food Aid Network, Voluntary Action Leeds and Forum Central. ref: 55869    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 02/12/2022

Effective from:

Decision:

The Chief Officer Community Hubs, Welfare and Business Support gave approval to provide funding of £1,110,000 to three organisations in Leeds to distribute funding to a range of third sector organisations and charities to provide clients on low incomes and in need with support for food, fuel and essential items. The organisations are;
• Leeds Food Aid Network - £490,000
• Forum Central- £300,000
• Voluntary Action Leeds- £320,000

Leeds City Council has been allocated £7,098,648.16 to spend between 1st October 2022 and 31st March 2022
This is a significant operational decision as a direct consequence of a key decision relating to the Household Support Fund for Leeds, ref D55289 and therefore not open to call in
For more information please refer to that decision.

Wards affected: (All Wards);

Lead officer: Joanna Rowlands


12/12/2022 - Leeds City Council Care Delivery Services: Specialist residential provision for people with dementia and more complex needs ref: 55870    

Brief Description

The Director of Adults and Health will be asked to consider:

-  the development of twelve specialist dementia beds at Dolphin Manor, Rothwell; and

-  sustaining the provision of ten specialist dementia beds at the Council’s RecoveryHub@South. 

 

The purpose of these services is to provide out-of-hospital care options for people with psychological, behavioural, and other more complex needs in dementia. Both the funding, and the service provision, involve close partnership working with NHS colleagues.

Impact On Wards

The Dolphin Manor development of specialist dementia care will be a provision serving the whole of Leeds, and some local residents may benefit from having this service provision, or the additional employment opportunities, nearby.

 

A potential adverse impact is that the specialist service will be developed by re-purposing existing residential (non-specialist) care beds. No-one already living at Dolphin Manor will be required to move, but future non-specialist capacity will be reduced. 

 

There is no impact anticipated from sustaining ‘The Willows’ at RecoveryHub@South; this proposal is to maintain existing provision.

Financial and procurement implications

·  The Council would invest in additional staffing to develop specialist dementia provision on one wing of Dolphin Manor, Rothwell. This would cost £435Kpa., and the minimum period for the specialist service development is proposed as three years. 

 

·  Sustaining the provision of ten specialist dementia beds at The Willows would renew the funding, staffing and procurement arrangements described in decision D52312[1], again for a proposed minimum of three years.  As follows: 

 

·  Income from the local NHS pooled in the local Better Care Fund arrangements[2], c. £0.9m pa., invested in:

·  c. £0.4m pa. expenditure on additional care staff, directly employed by the Council.

·  c. £0.5m pa. expenditure to sub-contract with Leeds Community Healthcare NHS Trust for nursing and physiotherapy services.

·  Proposed use of the negotiated procedure without prior publication of a notice under Regulation 32 (2) (b) (ii) of the Public Contracts Regulations 2015, to award the sub-contract to Leeds Community Healthcare Trust.

 

Full details and specific sums to be described in the decision report, including impact of NHS tariff uplifts since 2020.

Partnership working

The funding of the service at The Willows, and the proposed new service at Dolphin Manor, are joint commissioning arrangements with the NHS West Yorkshire Integrated Care Board, Leeds office (ICB). 

 

The ICB has already taken the decision to invest in the specialist clinical cover for the Dolphin Manor service development.

 

Both services are also partnership arrangements on the provider side.  The main parties are the Council; Leeds and York NHS Partnerships. Foundation Trust (LYPFT); and Leeds Community Healthcare NHS Trust (LCH).  This is set out in a Memorandum of Understanding for The Willows, to be developed further for Dolphin Manor.

 

The partnership working also includes the level of cover from the relevant local GP practices and the LCH Neighbourhood Team at Middleton, which covers the Rothwell area.

 



[1]https://democracy.leeds.gov.uk/ieDecisionDetails.aspx?ID=52312 NB. NHS Leeds Clinical Commissioning Group has been replaced by NHS West Yorkshire Integrated Care Board (Leeds office).

[2] A pooled budget arrangement under section 75 of the National Health Service Act (2006)

Decision Maker: Director of Adults and Health

Decision published: 02/12/2022

Effective from: 20/12/2022

Decision:

 

The Director of Adults and Health has approved the following, to improve access to out-of-hospital care options for people living with dementia and more complex needs:

 

A - Dolphin Manor, Rothwell: 

To invest £456Kpa. funding on a recurrent basis in the Council’s direct care provision at Dolphin Manor, to develop a specialist service for people living with complex needs in dementia. The purpose of the funding is to recruit additional care staff and thereby meet needs for care, support, and meaningful activity / occupation. The start date for this additional investment is subject to the timing of refurbishment works, and is anticipated to be during spring 2023.

 

To meet the additional costs by using the recurrent social care funding announced in the Chancellor’s Autumn Statement, an element of which has been allocated for the primary purpose of supporting hospital discharge.  The net additional cost is estimated as £450Kpa.

 

B - The Willows’, RecoveryHub@South:

To utilise the provision for negotiated procedure without publication of a notice under the Public Contracts Regulations 2015, Regulation 32 (2) (b) (ii), in order to enter into a contract with Leeds Community Healthcare NHS Trust (LCH) for the continuing provision of nursing and physiotherapy services. This contract to cover the period from 16th December 2022 to 31st March 2024, with an option to extend to 31st March 2025.  The contract funding comes from by ongoing pooled budget arrangements with the NHS, within the Better Care Fund (BCF), and the net cost to the Council is zero.

The annual value of this contract for 2022-23 is £244,897. The BCF income and contract expenditure will both be subject to the annual NHS England tariff uplift.  The contract value over its lifetime is £316,018 to end March 2024; or £560,915 if extended to March 2025.  This contract value will change annually in April with the addition of NHS tariff uplifts; and the costs will be offset by income via the above BCF arrangement, again with the annual NHS tariff uplift.

The Director of Adults and Health noted that the responsible officers to lead the implementation of these recommendations are: the Head of Service, Care Delivery; and the Commissioning Programme Lead, Dementia.

 

Wards affected: (All Wards);

Lead officer: Tim Sanders


30/11/2022 - Design & Cost Report for S278 Highway Works Associated With Construction of 8 Dwellings at Forsythia Avenue, East Ardsley, Wakefield, WF3 2HT. ref: 55868    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 30/11/2022

Effective from:

Decision:

The Chief Officer (Highways and Transportation);
a) Noted the detail of the highway works described in outline in paragraph 3 of this report and shown on plan 1907 101F General Arrangement and Highway Dedication plan attached at Appendix 3;
b) Gave authority to negotiate the terms of and enter into an agreement with the developer under the provisions of Section 278 of the Highways Act 1980; whereby the works associated with the development are carried out by the developer, fully-funded by the developer, and overseen by the Council.
c) Gave authority to incur expenditure of £5,000 staff costs to be fully funded by the developer through the S278 Agreement.
d) Approved alterations to the footway with reference to the powers contained in Section 66(4) of the Highways Act 1980.
e) Approved the adoption of new highway construction on land outlined blue on drawing number 1907 101F (Appendix 3) so that it can be added to the Council’s maintenance regime through the powers of Section 38 of the Highways Act 1980.

Wards affected: Ardsley and Robin Hood;

Lead officer: Matthew Woodrow


30/11/2022 - Rufford Park Primary School, Rufford Avenue LS19 7QR ref: 55866    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 30/11/2022

Effective from:

Decision:

The Head of Asset Management has given approval to the freehold transfer of this site to the Aireborough Learning Partnership Trust on the terms outlined in the report.

Wards affected: Otley and Yeadon;

Lead officer: Karen Hocker


30/11/2022 - Abbey Mills, Abbey Road, Kirkstall, LS5 3HP ref: 55865    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 30/11/2022

Effective from:

Decision:

The Chief Officer Asset Management & Regeneration has approved that Abbey Mills be marketed for sale by auction on the open market and that the sale be completed at a price no lower than an approved reserve price.

Wards affected: Kirkstall;

Lead officer: Edward Rowland


30/11/2022 - Authority to award a contract for the Supply of Snacks and Drinks ref: 55864    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 30/11/2022

Effective from:

Decision:

The Chief Officer, Culture and Economy has approved to award a contract for the Supply of Snacks and Drinks to J L Brooks Ltd.
The contract is due to commence on 5th December 2022 for a period of 1 year, with 4 x 12-month extensions. The estimated annual value is £45,037.31 (the total estimated value including extensions is £225,186.55).

Wards affected: (All Wards);

Lead officer: Lisa Broadest


30/11/2022 - Council Housing Growth Programme – Rough Sleepers Accommodation Programme (RSAP) Property Purchases Batch 7 ref: 55863    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 30/11/2022

Effective from:

Decision:

The Director of City Development:
1. Granted approval to purchase the properties, detailed in Confidential Appendix B, at Market Value as determined by Land & Property and authorised their use as designated Rough Sleeper accommodation, to be managed by Leeds Housing Options.
2. Authorised the required expenditure to enable the programme to progress the property acquisitions detailed in Confidential Appendix B. These property acquisitions will be funded from the Council Housing Growth Programme budget, via a combination of Housing Revenue Account (HRA) borrowing and a Homes England grant of £50,000 per property.
3. Noted that Executive Board granted Authority to Spend for the programme on 24th July 2019.
4. Noted that written approval to bring the properties back into council housing stock was provided by the Chief Officer (Housing) of Communities, Housing & Environment on 1st November 2022.

Wards affected: Kirkstall; Pudsey;

Lead officer: Liam Riley


08/12/2022 - To Seek Authority to Procure a Contract for the Supply of Groceries and Provisions ref: 55860    

 

 

To Seek Authority to Procure a Contract for the Supply of Groceries and Provisions

Decision Maker: Director of Resources

Decision published: 30/11/2022

Effective from: 16/12/2022

Decision:

The Director of Resources gave authority to procure contracts for the supply of groceries to commence 1st April 2023 for 16 months, with 1x12 month option to extend.

Estimated value £1,800,000 per annum (£4.2 million including extensions)

Wards affected: (All Wards);

Lead officer: Mandy Snaith


02/12/2022 - Leeds Town Hall – Pre Contract Services Agreement ref: 55862    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 30/11/2022

Effective from: 02/12/2022

Decision:

The Director of City Development approved authority to spend up to £379,806.91 from capital scheme 16996 for Kier Construction Limited Kier T/A Kier Construction North and Scotland to carry out services as detailed in the Pre Contract Services Agreement to be signed with Leeds City Council.

Wards affected: Hunslet and Riverside;

Lead officer: Martin Gresswell


08/12/2022 - Authority to Procure under the Vehicle Replacement Programme ref: 55861    

Fleet Services have identified vehicles that need to be replaced under the 2022/23 approved Vehicle Replacement Capital Programme with an estimated cost of £3.552 million. The vehicles to be replaced include 3 x EV refuse collection vehicles, 16 x Highways tipper gritters and 2 x narrow track refuse collection vehicles

 

Decision Maker: Director of Resources

Decision published: 30/11/2022

Effective from: 16/12/2022

Decision:

The Director of Resources approved:

 

Spend of £3.930m for the 2022/23 essential fleet replacement programme

 

The procurement of vehicles using the TPPL framework

 

The commencement of refuse collection fleet transition to zero emission EV

Wards affected: (All Wards);

Lead officer: Mandy Snaith


30/11/2022 - To seek authority to procure a Contract for the Supply of Fresh Bread and Morning Goods ref: 55867    Recommendations Approved

Decision Maker: Director of Resources

Decision published: 30/11/2022

Effective from: 30/11/2022

Decision:

The Chief Officer Civic Enterprise Leeds approved the authority to procure contracts for the supply of fresh bread and morning goods to commence 8th May 2023 for two years, with 1x12 month extensions.
Estimated value £145,000 per annum (£435,000 including extensions)

Wards affected: (All Wards);

Lead officer: Mandy Snaith


29/11/2022 - Transforming Cities Fund – Leeds City Centre Cycling Improvements; Southern Gateway Phase One ref: 55858    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 29/11/2022

Effective from:

Decision:

The Chief Officer, Highways & Transportation;

a) Noted and approved the proposed layout of Phase One of the Southern Gateway Scheme as shown on the attached drawing TM/05/855/GA/01
b) Given authority to issue the works and construct the scheme as shown.
c) Noted that phase one of this scheme, valued at £1m, is to be funded entirely from the West Yorkshire Combined Authorities Transforming Cities Fund as previously approved by Executive Board.
d) Noted that phase two of this scheme will be subject to a further report and approval.
e) Approved the request the City Solicitor to advertise Traffic Regulation orders as detailed on drawing TM-05-855-TRO-01 and, subject to no objections being received, make and seal the orders as advertised.
f) Approved with reference to the powers contained in Section 66(4) of the Highways Act 1980, that the relevant lengths of footway shown on attached Drawing No TM/05/855/GA/01 as proposed cycle tracks are removed and that following the removal of the footways, cycle tracks are constructed under the powers contained under the provisions of section 65(1) of the Highways Act 1980 for segregated or shared joint use by pedal cyclists and pedestrians.

Wards affected: Beeston and Holbeck; Hunslet and Riverside;

Lead officer: Andrew Richardson


29/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55857    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 29/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £191,884.15.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Cairine Doyle-Morrill


29/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55856    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 29/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £208,571.95.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ruth Terry


29/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55855    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 29/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £340,132.55.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ben Finley


29/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55854    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 29/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £455,571.10.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ben Finley


07/12/2022 - To seek authority to procure a Contract for the Supply of Fresh Raw Meats and Cooked Chilled Meats ref: 55859    

To approve the procurement of a new contract for the supply of Fresh Raw Meats and Chilled Cooked Meats to Leeds City Council establishments

Decision Maker: Director of Resources

Decision published: 29/11/2022

Effective from: 15/12/2022

Decision:

The Director of Resources approved the authority to procure contracts for the supply of fresh meat and chilled cooked sliced meats to commence 18th July 2023 for three years, with 2x12 month extensions.

Estimated value £800,000 per annum (£4million including extensions)

Wards affected: (All Wards);

Lead officer: Mandy Snaith


28/11/2022 - Approval of Care Plans Over 100k ref: 55853    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 28/11/2022

Effective from:

Decision:

The Deputy Director, Access & Care Delivery approved the contents of a report regarding a care plan in respect of a person with complex care needs, the individual cost of which is £160,000-00 per annum. It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable citizen of the City and the actions being taken to enable that person to live independently in a safe environment. This is a new support plan and CHC assessment is still to be completed.

Wards affected: (All Wards);

Lead officer: Shona McFarlane


28/11/2022 - Approval of Care Plans Over 100k ref: 55852    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 28/11/2022

Effective from:

Decision:

The Deputy Director, Access & Care Delivery approved the contents of a report regarding a care plan in respect of a person with complex care needs, the individual cost of which is £204,059.58 per annum. It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable citizen of the City and the actions being taken to enable that person to live independently in a safe environment. This is a new support plan and is Vale of York CHC fund 3 hours per day, Advised by CHC assessor – Leeds that was involved it is a 75% / 25% split between Leeds/ Vale of York CHC.

Wards affected: (All Wards);

Lead officer: Shona McFarlane


28/11/2022 - Approval of Care Plans Over 100k ref: 55851    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 28/11/2022

Effective from:

Decision:

The Deputy Director, Access & Care Delivery approved the contents of a report regarding a care plan in respect of a person with complex care needs, the individual cost of which is £413,972.00 per annum. It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable citizen of the City and the actions being taken to enable that person to live independently in a safe environment. This is a new support plan and the service user will pay the client contribution. CHC checklist completed

Wards affected: (All Wards);

Lead officer: Shona McFarlane


28/11/2022 - Approval of Care Plans Over 100k ref: 55850    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 28/11/2022

Effective from:

Decision:

The Deputy Director, Access & Care Delivery approved the contents of a report regarding a care plan in respect of a person with complex care needs, the individual cost of which is £527,228.00 per annum. It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable citizen of the City and the actions being taken to enable that person to live independently in a safe environment. This is a new support plan and is 100% CHC funded.

Wards affected: (All Wards);

Lead officer: Shona McFarlane


28/11/2022 - Approval of Care Plans Over 100k ref: 55849    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 28/11/2022

Effective from:

Decision:

The Deputy Director, Access & Care Delivery approved the contents of a report regarding a care plan in respect of a person with complex care needs, the individual cost of which is £172,137.70 per annum. It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable citizen of the City and the actions being taken to enable that person to live independently in a safe environment. This is a new support plan and is 100% CHC funded.

Wards affected: (All Wards);

Lead officer: Shona McFarlane


28/11/2022 - Approval of Care Plans Over 100k ref: 55848    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 28/11/2022

Effective from:

Decision:

The Deputy Director, Access & Care Delivery approved the contents of a report regarding a care plan in respect of a person with complex care needs, the individual cost of which is £109,200-00 per annum. It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable citizen of the City and the actions being taken to enable that person to live independently in a safe environment. This is a new support plan and is not eligible for CHC funding. The service user is contributing £133.39 per week and is in the process of applying for PIP.

Wards affected: (All Wards);

Lead officer: Shona McFarlane


23/11/2022 - District Heating Annual Report 2022 ref: 55847    Recommendations Approved

To note that good progress has been made with district heating over the last year with significant growth planned for this year and to take some operational decisions re pricing strategies to reflect global utility volatility and to prepare for forthcoming legislation. 

 

Decision Maker: Executive Board

Made at meeting: 23/11/2022 - Executive Board

Decision published: 28/11/2022

Effective from: 03/12/2022

Decision:

The Director of Resources submitted a report which presented the District Heating annual report 2022. The report reviewed the operational and financial performance of the programme over the past year and forecasted key activities and anticipated performance for the short term. The report also considered the impact of global gas price increases on the pricing strategy for current and future customers, outlined the likely impact of key forthcoming legislation and recommended actions with regard to proposed changes to heat tariff indexation and also regarding proposals to extend the district heating connection to the Lovell Park multi-storey flats.

 

In introducing the report, the Executive Member for Infrastructure and Climate provided an overview of the key themes within it and the progress which continued to be made through the district heating network. The Executive Member also extended her thanks to the Sustainable Energy and Air Quality team for the work that it had undertaken to get the network to its current position.

 

Responding to a Member’s enquiry, the Board was provided with further details on the level of financial support which had been provided by Government in this area. With regard to the specific Government support relating to the district heating scheme, it was undertaken that further information on this would be provided to the Member in question.

 

In relation to an enquiry regarding maximising the benefits of the district heating scheme and other alternative sustainable energy schemes for domestic customers across the city, the Board received an overview of the work which the Council continued to undertake with partners in this area. 

 

Following consideration of Appendix 1 to the submitted report designated as being exempt from publication under the provisions of Access to Information Procedure Rule 10.4(3), which was considered in private at the conclusion of the public part of the meeting, it was

 

RESOLVED –

(a)  That approval be given to offer the proposed changes to heat tariff indexation, as set out in exempt Appendix 1 to the submitted report, in order to deal with the ongoing global spikes in gas prices;

 

(b)  That approval be given to commit £840k of Housing Revenue Account (HRA) budget to secure the district heating connection to the Lovells in anticipation of securing Social Housing Decarbonisation and Home Upgrade Grant Funding as match funding;

 

(c)  That the proposal to seek accreditation from the Heat Trust for the Leeds PIPES network by summer 2023, be supported, in order to help prepare for future heat network regulation;

 

(d)  That the financial performance of the network, as detailed within the submitted report, be noted; with it being acknowledged that the Director of Resources will continue to have delegated authority to take operational decisions to optimise commercial performance, with such matters being reported annually to Executive Board.

Lead officer: George Munson


23/11/2022 - Financial Health Monitoring 2022/23 - Month 6 (September) ref: 55844    Recommendations Approved

Decision Maker: Executive Board

Made at meeting: 23/11/2022 - Executive Board

Decision published: 28/11/2022

Effective from: 03/12/2022

Decision:

The Chief Officer Financial Services submitted a report presenting an update on the financial health of the Authority in respect of both the General Fund revenue budget and the Housing Revenue Account, as at Month 6 (September) of the 2022/23 financial year.

 

In presenting the report, the Executive Member for Resources provided an overview of the key information within it, which included reference to the fact that an overspend of £16.6m was projected for the Authority’s General Fund services, as at month 6 of 2022/23. Emphasis was placed upon the range of in-year pressures currently being faced, with the lower collection rates for Council Tax and Business Rates also being noted. 

 

Responding to a specific enquiry regarding the month 6 projection of an underspend and carry forward into 2023/24 in respect of the Dedicated Schools Grant (DSG), the Board discussed and received further information on the actions being taken to allocate available funding in this area. Members also received an update on the actions being taken with regard to recruitment and the wider recruitment challenges being faced in this field nationally. Furthermore, details were also provided on the wider context around the relationship between the DSG and the High Needs Block funding. In conclusion, it was suggested that the directorate provide the Member in question with further information on such matters, as appropriate.

 

In response to a Member’s enquiry on the projected level of underspend regarding the waste management service, the Board received further information on the work which continued on maximising income from recyclable waste, which it was noted would form part of the directorate’s budget proposals moving forward. Also, an update was provided on the refuse collection route review taking place, with it being noted that no savings had been assumed from this work in 2022/23, however, wider benefits from the review would be delivered in 2023/24 and beyond.

 

Also, in response to a specific enquiry, officers provided the Board with further information regarding the cost recovery model for Leeds Building Services. 

 

RESOLVED –

(a)  That it be noted that as at Month 6 of the financial year (September), the Authority’s General Fund services are forecasting an overspend of £16.6m and that the Housing Revenue Account is forecasting an overspend of £0.17m, with it also being noted that the General Fund position reduces to £15.83m when account is taken of additional budget action plans received to date;

 

(b)  That it be noted, that where an overspend is projected, directorates, including the Housing Revenue Account, are required to present action plans to mitigate their reported pressures, in line with the Revenue Principles agreed by Executive Board in 2019; with it also being noted that proposals received to date are included within the submitted report at Appendix 4 and that further action plans will be received at the December 2022 meeting of Executive Board;

 

(c)  That it be noted that known increased inflation and known impacts of the rising cost of living, including the agreed 2022/23 pay award, have been incorporated into this reported financial position, with it also being noted that these pressures will continue to be assessed, with the latest position being incorporated into future reports to be received by Executive Board.


23/11/2022 - Treasury Management Strategy Update 2022/23 ref: 55846    Recommendations Approved

Decision Maker: Executive Board

Made at meeting: 23/11/2022 - Executive Board

Decision published: 28/11/2022

Effective from: 03/12/2022

Decision:

The Chief Officer Financial Services submitted a report which presented a review and update of the Council’s Treasury Management Strategy for 2022/23, and which sought a change to the Borrowing Strategy, as detailed.

 

The Executive Member introduced the report, providing the Board with details on the key issues within it and highlighting the current approach being taken towards longer term borrowing.

 

Members welcomed the submitted report and extended their thanks to those within the Treasury Management team for the work that they continued to undertake.

 

RESOLVED –

(a)  That the update provided on the Treasury Management borrowing and investment strategy for 2022/23, as detailed within the submitted report, be noted;

 

(b)  That the change to the Borrowing Strategy, as detailed at section 6.3.13 of the submitted report, be approved.


23/11/2022 - Operation London Bridge: Leeds City Council and the City's response to the passing of the late HM Queen Elizabeth II ref: 55843    Recommendations Approved

Decision Maker: Executive Board

Made at meeting: 23/11/2022 - Executive Board

Decision published: 28/11/2022

Effective from: 03/12/2022

Decision:

The Chief Executive submitted a report summarising the response across the Council and the city during the 10-day mourning period which marked the passing of the late HM Queen Elizabeth II, known as ‘Operation London Bridge’. The report also provided an update on plans to permanently commemorate the life of HM Elizabeth II across the city and to progress lessons learnt into future ‘Bridge’ protocol and implementation.

 

The Leader introduced the key aspects of the report and on behalf of the Board, he, together with other Members, extended their thanks to all those from within the Council and from partner organisations who had ensured that Operation London Bridge had been appropriately and effectively conducted across the city. 

 

Members were supportive of proposals to permanently commemorate the life of HM Elizabeth II, with assurance being provided that consultation on such matters would be undertaken on a cross-party basis prior to arrangements being finalised.

 

Responding to a specific enquiry raised regarding the timing of the cancellation of some formal meetings around this time, it was highlighted that such comments were welcomed as they would be taken into consideration as part of the lessons learnt review work taking place.

 

RESOLVED –

(a)  That the key impacts and wider response to Operation London Bridge, as detailed within the submitted report, be noted;

 

(b)  That on behalf of the Council, the Board extends its thanks to the Council’s staff and its partners for their efforts, which ensured a timely and appropriate Council and city response;

 

(c)  That the plans, as outlined within the submitted report for permanent commemoration to mark the life of HM Elizabeth II, be supported.


23/11/2022 - Capital Programme 2022/23 - 2026/27 Quarter 2 Update ref: 55845    Recommendations Approved

Hunslet Hall is now surplus to the Council’s requirements and it is therefore proposed to add the property to the Capital Receipt Programme and dispose on the open market.

Decision Maker: Executive Board

Made at meeting: 23/11/2022 - Executive Board

Decision published: 28/11/2022

Effective from: 03/12/2022

Decision:

The Chief Officer Financial Services submitted a report presenting the updated Capital Programme for the period 2022-2027, which was split between the General Fund and Housing Revenue Account (HRA) and which also provided a forecast of resources available over that period. In addition, the report provided a specific update on the 2022/23 programme, and which sought a number of related decisions from the Board, as recommended in the report.

 

The Executive Member for Resources introduced the report noting the injections into the Capital Programme which were being proposed, highlighting the additional Capital Receipts Incentive Scheme (CRIS) allocations to Wards and Community Committees, proposing spending priorities for the investment of the Community Infrastructure Levy (CIL) Strategic Fund and which looked to insert Hunslet Hall into the Capital Receipt Programme for disposal in the current financial year.

 

Responding to Members’ enquiries, the Board received an update on the West Yorkshire Combined Authority (WYCA) review of schemes within the West Yorkshire Transport Fund which was being undertaken in response to the significant inflationary pressures being experienced. With regard to the relevant decision making processes, it was noted that such matters were scheduled to be considered by the meeting of WYCA on the 8th December, at which point, if agreed by WYCA, they would be reflected, as appropriate, in the Council’s Capital Programme budget proposals moving forward. Responding to Members’ comments regarding the involvement of the Council in such matters and the timing of such involvement, further details were provided. 

 

RESOLVED –

(a)  That the following injections into the Capital Programme, as detailed at Appendix A (iii) of the submitted report, be approved:-

·  £4,710.0k of West Yorkshire Combined Authority Grant for the Active Travel Tranche 3 Programme;

·  £2,844.1k of Disabled Facilities Grant in line with the announced 22/23 Grant allocation;

·  £881.0k of Government and European Grant Funding, Private Sector (GF) and Major Repairs Reserve (HRA) contributions for the Holbeck Group Repair Phase 2 scheme;

·  £568.0k of Transforming Cities Fund (TCF) Grant and Network Rail contribution for the Leeds Station Sustainable Travel Gateway scheme;

·  £392.0k of ringfenced capital receipts to the Future Ways of Working (FWoW) Programme based on the actual value of realised capital receipts; and

·  £214.1k of other contributions to Highways schemes.

 

(b)  That it be noted that the above resolutions to inject funding of £9,609.2k will be implemented by the Chief Officer Financial Services;

 

(c)  That the latest position on the General Fund and HRA Capital Programme as at Quarter 2 of 2022/23, as detailed within the submitted report, be noted;

 

(d)  That the additional Capital Receipts Incentive Scheme (CRIS) allocations to Wards and Community Committees for the period: April 2022 to September 2022 of £54.9k, be noted;

 

(e)  That the following spending priority for the investment of the Community Infrastructure Levy (CIL) Strategic Fund be agreed: for any successful Levelling Up Fund bids, the Leeds Flood Alleviation Scheme Phase 2, the City Square Enhancements Scheme and the David Oluwale Bridge Scheme;

 

(f)  That agreement be given to insert Hunslet Hall into the Capital Receipt Programme for disposal in the current financial year, which will be implemented by the Director of City Development.

Wards affected: Hunslet and Riverside;

Lead officer: Mark Mills


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55842    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £208,571.95.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ruth Terry


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55841    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £253,937.80.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ben Finley


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55840    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £244,064.55.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Joel Hanna


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55838    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £312,943.70.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ruth Terry


25/11/2022 - School Streets Evaluation of Phases 1 and 2 and Recommendations for Future Phases ref: 55837    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 25/11/2022

Effective from:

Decision:

The Chief Officer (Highways & Transportation);

a) Noted the contents of this report
b) Approved the School Streets Evaluation Report and its recommendations provided as Appendix 1.
c) Reconfirmed the objectives of School Streets in Leeds as:
d) Set up a School Streets Steering Group to make to make key decisions about the selection and prioritisation of future School Street sites (note that it is recommended that Leeds City Council’s Highways Board will remain the final decision-making body for policy decisions relating to School Streets including annual monitoring).
e) Approved the proposed three-stage selection and prioritisation process for future School Streets in Leeds. This can then be applied fully to the selection of Phase 3 School Streets in Leeds.
f) Considered an annual funding programme and source of funding for future implementation of School Streets. Options may include:
a. Schools self-funded (as per school crossing patrol process)
b. Planning contributions – estimated costs could be included in the annual publication of H&T fees and charges)
g) Considered and agree the need for additional (dedicated) staffing resource to oversee the implementation of future School Streets. School Travel Plan review fees could fund an SO2 FTE post.
h) Confirmed the preferred legal Traffic Regulation Order instrument to be used for future School Streets in Leeds: Experimental Traffic Regulation Order ((E)TRO), then full Traffic Regulation Order or straight into full TROs.
i) Approved a recommendation to source and trial folding School Streets signs to overcome the need for and expense of ‘sign-bagging’ during school holidays as the TRO applies all year round.
j) Acknowledged the current limitations on enforcing School Streets restrictions. Instruct further work to agree how School Streets will be enforced in Leeds with and without potential additional Section 6 powers.
k) Confirmed Leeds City Councils’ intention to apply to the Secretary of State for Transport, DfT for a Designation Order under Part 6 of the Traffic Management Act 2004. This would designate Leeds City Council as an enforcement authority with moving traffic enforcement powers in Leeds, so that civil enforcement of moving traffic contraventions, including prescribed traffic signs for use at School Street schemes can be undertaken.
l) Agreed an ongoing evaluation and monitoring programme for School Streets installed in Leeds and the resourcing of it.

Wards affected: (All Wards);

Lead officer: Lynsey McGarvey


25/11/2022 - Design Cost Report – Early Works (2) Associated with Coop Academy Nightingale SEN partnership provision for September 2023 ref: 55836    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Chief Officer, Resources & Strategy agreed to:

• Approve authority to spend and incur expenditure of £450,000 from capital scheme number 33471/NTG/000 to allow the contractor to place key orders to ensure the accommodation associated with the SEN provision is delivered for September 2023.

• Note the programme dates identified in section 8 of this report and the urgency to ensure the build solution is available from September 2023.

• Note that the officer responsible for implementation is the Head of Learning Systems in Children’s and Families Directorate.


Wards affected: Gipton and Harehills;

Lead officer: Adele Robinson


25/11/2022 - Authority to procure and appoint a market development partner for the Home Care transformation programme ref: 55833    Recommendations Approved

Decision Maker: Director of Adults and Health

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Adults and Heath has approved the award of a twelve month contract through a direct award via the ESPO 664_1 Framework for Consultancy Services to ARCC HR Ltd to support the home care transformation programme from 28th November 2022 (with an extension provision of up to a further 12 months) with a total potential value of £150,000.

Wards affected: (All Wards);

Lead officer: Kate Sibson


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55831    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £450,775.00.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment

Wards affected: Various;

Lead officer: Ruth Terry


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55830    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £194,753.05.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Julie Longworth


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55829    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £196,056.10.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ruth Terry


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55828    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £193,450.00.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Farah Husain


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55827    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £339,450.00.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ruth Terry


05/12/2022 - Decision to receive 'Supporting Families' (formerly Troubled Families) grant funding income of £8.6m from Department for Levelling Up, Housing and Communities (DLUHC) across a 2 year period commencing on 1st April 2023 ref: 55832    Recommendations Approved

Decision to receive ‘Supporting Families’ (formerly Troubled Families) grant funding income of £8.6m from Department for Levelling Up, Housing and Communities (DLUHC). This is for the period of 2023 to 2025 and is broken down as follows:

2023/24: £4.1m

2024/25: £4.5m

The figures are only indicative at this stage and formal confirmation of the figure will be notified by DLUHC nearer to the beginning of each financial year.

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from: 13/12/2022

Decision:

The Director of Children & Families approves the receipt of grant income from DLUHC for £8.6m to commence on 1st April 2023. The Director of Children & Families approves the proposed use of the grant funding.

 

The grant commences on 1st April 2023 for a period of 24 months. The grant income is £8.6m. This is broken down to £4.1m for 2023/24 and £4.5 2024/25.

 

Wards affected: (All Wards);

Lead officer: Lyndsey Mortimer


28/11/2022 - Approval to Extend the Bridges Maintenance & Masonry Repairs 2019 – 2021 contract to 2023 ref: 55835    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 25/11/2022

Effective from: 28/11/2022

Decision:

The Chief Officer (Highways and Transportation) approved the recommendation to extend the Bridges Maintenance and Masonry Repairs 2019 – 2021 Contract for a further 12 months to 30th November 2022 with Hinko Construction Ltd, Coating Services Ltd, RAM Services Ltd and Route One Infrastructure Ltd. The estimated cost of the 12-month extension for Leeds City Council is approximately £550,000.00.

Wards affected: (All Wards);

Lead officer: Megan Chamberlain


25/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55839    For Determination

Decision Maker: Director of Children and Families

Decision published: 25/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £284,178.05.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ben Finley


30/11/2022 - Approval to vary the existing contract with Leeds Community Healthcare NHS Trust (LCHT) to implement additional funding for the Integrated Sexual Health Service in order to respond to the monkeypox outbreak ref: 55834    Recommendations Approved

Decision Maker: Director of Public Health

Decision published: 25/11/2022

Effective from: 30/11/2022

Decision:

The Director of Public Health has:-

Approved one off non recurrent funding of £129,734 to Leeds Sexual Health Service to respond to the unprecedented monkeypox outbreak whilst managing increased demand on sexual health services. This activity and funding is for the period of November 2022 to March 2023.

Approved the variation of the current contract with LCHT in accordance with Contract Procedure Rule (CPR) 21.6 and 21.7 for the implementation of this one off funding.

Noted that this funding will be spent by the 31st of March 2023, any unused funding that cannot be used for this purpose will be returned to the Public Health Team at the Council.

Wards affected: (All Wards);

Lead officer: Sharon Foster


24/11/2022 - Tender Evaluation report seeking approval to award Steeplejack and Roofing Surveys including Minor Repairs of Multi Storey Flats. ref: 55826    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 24/11/2022

Effective from:

Decision:

The Director of Communities, Housing and Environment noted the tender evaluation process and approved the award of the contract to Stroma Specialist Access Ltd, for the Steeplejack and Roofing Surveys Including Minor Repairs of Multi Storey Flats for a period of three years with the option to extend for up to 12 months. The start date for this contract will be the 12th December 2022 with and initial end date of 11th December 2025 with the option to extend for up to 12 months for an estimated value of £200,000 per annum.

This is a Significant Operational Decision and a direct consequence of a key decision taken on 21/6/22 ref D55358 and therefore is not eligible for call in

Wards affected: (All Wards);

Lead officer: Adam Crampton


24/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55825    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 24/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £200,750.00.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Farah Husain


24/11/2022 - To provide a total of £240,000 from the Household Support Fund to six advice charities in Leeds. ref: 55823    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 24/11/2022

Effective from:

Decision:

The Chief Officer Community Hubs, Welfare and Business Support gave approval for funding of £240,000 to six advice charities in Leeds who will receive up to £40,000 each to provide clients on low incomes and in need with support for food, fuel and essential items. The organisations are;
o Citizens Advice Leeds
o Chapeltown Citizens Advice Bureau
o Burmantoft Community Projects
o Gipsil
o Better Leeds Communities
o St Vincents Support Centre

• Leeds City Council has been allocated £7,098,648.16 to spend between 1st October 2022 and 31st March 2022.

• This is a significant operational decision as a direct consequence of a key decision taken on 26.5.22 regarding the Household Support Fund for Leeds ref D55289. For more information please see the report relating to the key decision.

Wards affected: (All Wards);

Lead officer: Joanna Rowlands


24/11/2022 - Approval to accept Government Winter Pressures Homelessness grant funding ref: 55821    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 24/11/2022

Effective from:

Decision:

a. The Director of Communities, Housing and Environment approved the acceptance of the Government Winter Pressures funding of £183,680 for 2022/23 and its use for activities as described in this report including block booked beds, additional accommodation and a personalised budget.

b. Approved an allocation of up to £12,698 as grant to St Anne’s Community Services to fund weekend opening at the Resource Centre.

c. Approved an allocation of up to £7,982 as grant to Change Grow Live to fund additional weekend outreach sessions.

Wards affected: (All Wards);

Lead officer: Simon Pickering


24/11/2022 - Accept Multiply Funding Agreement 2022-25 ref: 55820    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 24/11/2022

Effective from:

Decision:

The Director of City Development agreed to:
a) Accept the Multiply Funding Agreement from WYCA for a local authority grant allocation of £1,274,399 over Years 2022 – 2025.
b) Authorise the Council to, sign, seal and return the agreement to the WYCA legal team.

Wards affected: (All Wards);

Lead officer: Martyn Long


24/11/2022 - Approval of a care plan to the value between £100,000 and £500,000 per annum ref: 55824    Recommendations Approved

Decision Maker: Director of Children and Families

Decision published: 24/11/2022

Effective from:

Decision:

The Director, Children & Families agreed the recommendation of a report relating to the placement of a child/young person. The individual costs of the place are £170,487.85.

It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable child or young person of the City and the actions being taken to enable that person to live in a safe environment.

Wards affected: Various;

Lead officer: Ben Finley


02/12/2022 - Contract for the supply and maintenance of Fire Fighting Equipment and evacuation requirements ref: 55822    

To seek approval of the Director of Communities, Housing & Environment for the authority to procure a contract for the supply and maintenance of Fire Fighting Equipment and evacuation requirements. for Leeds City Council to commence 1stApril 2023.

The contract will be for a three year period with an option to extend for up to a further 2 years to commence on 1st April 2023, with an estimated annual cost of approximately £300k per year.

Decision Maker: Director of Communities, Housing & Environment

Decision published: 24/11/2022

Effective from: 10/12/2022

Decision:

The Chief Housing Officer gave approval to procure a new contract to replace the existing arrangements. The new contract will be for a three-year period with an option to extend by 2 x 12 months.  The contract will start on 1st April 2023 and will have an annual cost of approximately £420k giving a total contract value of £2,200,000 including extensions.  This figure includes provision to increase as additional assets are added to the service contract.

 

Wards affected: (All Wards);

Lead officer: Adam Crampton


23/11/2022 - Safer Streets Fund 4 – Addressing violence against women and girls in public places ref: 55819    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 23/11/2022

Effective from:

Decision:

The Director of Communities, Housing and Environment has taken the decision:
• To approve the spend of £208,095 of Home Office grant funding as per the funding application submitted by the West Yorkshire Combined Mayoral Authority of behalf of Leeds City Council.

Wards affected: (All Wards);

Lead officer: Simon Hodgson


23/11/2022 - Award Report Lindsey Road Community Garden ref: 55816    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 23/11/2022

Effective from:

Decision:


The Director of Communities, Housing and Environment has:-

a) Approved the award of a contract to Horticon Limited to the value of £125,530 to deliver a community garden in Lincoln Green.

b) Recognised that Appendix 1 – Tender Analysis Report – should be designated exempt from publication in accordance with information procedure rule 10.4(3).

Wards affected: Burmantofts and Richmond Hill;

Lead officer: Marie Pierre Dupont


23/11/2022 - Authority to extend current Fire Equipment Contract for 3 months to enable a procurement process to be undertaken for a new contract. ref: 55817    Recommendations Approved

Decision Maker: Director of Communities, Housing & Environment

Decision published: 23/11/2022

Effective from: 23/11/2022

Decision:

The Chief Officer of Housing gave his approval to extend the current Fire Equipment Contract for 3 months to enable a procurement process to be undertaken. The extension will be for 3 months. This will ensure we do not encounter a gap in service delivery. The new contract will be for a three-year period with an option to extend by 2 x 12 months to start on the 1st April. This extension bridges the gap between Jan and March 2023.

This extension of 3 months is within the procedural rules that allow sufficient time to manage a new procurement. The governance for the new contract is already in place and the procurement project has started and is on target to deliver within the timescales of this extension.

Wards affected: (All Wards);

Lead officer: Adam Crampton


01/12/2022 - Procurement of a contract for roofing refurbishment works at Halliday Court, Garforth ref: 55818    

The Director of Communities, Housing and Environment is asked to approve the procurement and implementation of a new contract to undertake re-roofing works for a sheltered housing complex in Garforth, Halliday Court.

 

Decision Maker: Director of Communities, Housing & Environment

Decision published: 23/11/2022

Effective from: 09/12/2022

Decision:

The Director of Communities, Housing and Environment

a)  Approved the Authority to Procure the proposed procurement strategy in line with CPR 3.1.7 to source an external contractor to deliver the re-roofing works following competitive procedure utilising and inviting specialist roofing contractors from Constructionline following an expression of interest which provided a list of 9 interested contractors. It should be noted that all contractors invited to tender will be fully vetted by the Council prior to contract award in order for it to satisfy itself that the contractors demonstrate their technical and financial ability and capacity to deliver this scheme.

b)  Approved the Authority to Spend of £650,000 for construction to undertake and complete the required re-roofing works at Halliday Court, as referred to in paragraph 13 of the report.

 

Wards affected: Garforth and Swillington;

Lead officer: Paul Rounding


29/11/2022 - Leeds Arena Hire for Culture and Economy Events ref: 55815    

To award a five year zero value contract to ASM Global Ltd for the hire of Leeds Arena to facilitate call-off orders to book various Culture and Economy events as and when they occur.

Decision Maker: Director of City Development

Decision published: 21/11/2022

Effective from: 07/12/2022

Decision:

The Chief Officer Culture and Economy authorised the direct award of a 5 year £0 value contract to ASM Global Ltd for the hire of the Arena to facilitate call-off orders totalling up to a maximum of £500,000 over the period of the Contract. The contract award is in the best interest of the Council relying on public contracts regulation 32 (2) (b) where the works, supplies, or services can be supplied only by a particular economic operator as the competition is absent for technical reasons. The technical reason is the Arena is the only indoor venue in the City that has capacity for 5000 to 10,000 attendees.

 

The overall contract will be self-funding from income generated by exhibitors at the events.

 

Wards affected: (All Wards);

Lead officer: Martyn Long


28/11/2022 - Decision to inject Supporting Families funding into to 3 x contracts to enable Specialist Coordinator Roles in Early Help ref: 55807    Recommendations Approved

Request to vary the contracts with Humankind (DN210921), Touchstone (DN325642) & Women’s Aid (DN194503 - CONTRACT-9Y9N-Z2LOII) to enable continuation of Specialist Coordinator Roles in Early Help.

This provision has been in place since 2019 via delegated decisions: D48705, D52901 & D55039.

The variation would be from 1st April 2023 to 31st March 2025.

The total cost for the decision is: £772,454 and is fully funded via the Supporting Families grant.

It is considered that continuing with these roles supports the outcomes of the Leeds Early Help Review and is in line with the recommendations of the McAllister review. 

Decision Maker: Director of Children and Families

Decision published: 18/11/2022

Effective from: 06/12/2022

Decision:

The Director of Children & Families approved the following:

 

1)  An injection to the contract for the Community Drug and Alcohol Prevention, Treatment and Recovery Service (currently held with Humankind and known as Forward Leeds DN210921). The injection of funds is Supporting Families - Earned Autonomy funding of up to £250,262.00 to commence on 1st April 2023 for 24 months for the purposes of 3 x specialist coordinators for substance misuse. A new contract for the Community Drug and Alcohol Prevention, Treatment and Recovery Service is to be awarded to commence on 1st April 2023 and a separate decision has been sought for this (D55671).

 

2)  An injection to the contract for the Community Based Mental Health Service (currently held with Touchstone and known as Live Well Leeds DN325642). The injection of funds is Supporting Families - Earned Autonomy funding of up to £277,793.00 to commence on 1st April 2023 for 24 months for the purposes of 3 x specialist coordinators for mental health. The current contract with Touchstone is due to expire on 31st March 2024. A variation in respect of this injection will be made for 12 months (1st April 2023 to 31st March 2024) in accordance with Contract Procedure Rule 21.7 and under the Public Contracts Regulations 2015 via Regulation 72 (1) (b) Modification of contracts during their terms. The tender for the new Community Based Mental Health Service for a new contract commencing on 1st March 2024 will include an injection of supporting Families funding for 12 months.

 

3)  An injection to the contract for the Domestic Violence and Abuse Services (currently held with Leeds Women’s Aid and known as Leeds Domestic Violence Service DN194503 - CONTRACT-9Y9N-Z2LOII). The injection of funds is Supporting Families - Earned Autonomy funding of up to £244,400.00 to commence on 1st April 2023 for 24  months for the purposes of 3 x specialist coordinators for domestic violence. This will be done via a variation to the contract in accordance with Contract Procedure Rule 21.7 and under the Public Contracts Regulations 2015 via Regulation 72 (1) (b) Modification of contracts during their terms.

 

Wards affected: (All Wards);

Lead officer: Helen Stevens


23/11/2022 - Starship Technologies - trial use of personal delivery devises (autonomous droids) to provide a last mile home delivery service in a selected area of Leeds ref: 55803    

The company ‘Starship Technologies’ offers an innovative, last-mile solution that reduces carbon emissions, helps drive sales for businesses in the area and provides a cost-effective, convenient (and fun!) service to local residents

Approval required for Starship Technologies to trial the use of personal delivery devise (autonomous droids) in the Adel / Tinshill residential areas of Leeds to make home deliveries on behalf of two local participating CO-OP stores. Initial trial will be for 3 months but could be extended if successful.

Decision Maker: Director of City Development

Decision published: 15/11/2022

Effective from: 01/12/2022

Decision:

 

The Chief Officer for Highways and Transportation has:

a)  Given authority for Starship Technologies to conduct a trial in the use of Personal Delivery Droids (PDDs) to provide an innovative home delivery grocery service in the Northwest area of Leeds. Initial trial will be for three months with an option to extend the trial period if successful with further approval from Highways Board. Any decision to expand the trial area(s) would need to be brought back to Highways board for further approval and recommendation.

 

b)  Recognised that there is currently no national legislation which specifically governs the operation of robotic Personal Delivery Devices (PDDs) within the UK. In particular, the legal position on the use of PDDs on the public footpath is unclear.

 

c)  Accepted that PDDs will share the residential footpaths with pedestrians and that the necessary amount of consultation and engagement with key accessibility / disability groups has taken place. Accordingly, routes and operations during the trial can be amended in real-time if required to respond to local feedback.

 

Wards affected: Adel and Wharfedale; Weetwood;

Lead officer: Rupert Oldfield