Agenda and minutes

City Plans Panel - Thursday, 18th May, 2017 1.30 pm

Venue: Civic Hall, Leeds

Contact: John Grieve , 0113 224 3836  Email: john.grieve@leeds.gov.uk

Items
No. Item

A Member site visit was held in the morning in connection with the following proposals: Application Nos 16/07714/FU & 16/07734/LI Former Doncaster Monkbridge Site and other redevelopment sites along Whitehall Road and PREAPP 17/00098 – Sweet Street, Holbeck and was attended by the following Councillors: J McKenna, C Campbell, D Blackburn, S McKenna,

P Gruen, A Garthwaite, C Macniven and T Leadley.

 

168.

Appeals Against Refusal of Inspection of Documents

 

To consider any appeals in accordance with Procedure Rule 15.2 of the Access to Information Rules (in the event of an Appeal the press and public will be excluded)

 

(*In accordance with Procedure Rule 15.2, written notice of an appeal must be received by the Head of Governance Services at least 24 hours before the meeting)

 

Minutes:

There were no appeals against the refusal of inspection of documents

 

169.

Exempt Information - Possible Exclusion of Press and Public

1  To highlight reports or appendices which officers have identified as containing exempt information, and where officers consider that the public interest in maintaining the exemption outweighs the public interest in disclosing the information, for the reasons outlined in the report.

 

2  To consider whether or not to accept the officers recommendation in respect of the above information.

 

3  If so, to formally pass the following resolution:-

 

  RESOLVED – That the press and public be excluded from the meeting during consideration of the following parts of the agenda designated as containing exempt information on the grounds that it is likely, in view of the nature of the business to be transacted or the nature of the proceedings, that if members of the press and public were present there would be disclosure to them of exempt information, as follows:-

 

 

 

Minutes:

There were no items identified where it was considered necessary to exclude the press or public from the meeting due to the nature of the business to be considered.

170.

Late Items

 

To identify items which have been admitted to the agenda by the Chair for consideration

 

(The special circumstances shall be specified in the minutes)

 

Minutes:

There were no late items of business.

171.

Declarations of Disclosable Pecuniary Interests

 

To disclose or draw attention to any disclosable pecuniary interests for the purposes of Section 31 of the Localism Act 2011 and paragraphs 13-16 of the Members’ Code of Conduct. 

Minutes:

Councillor J Heselwood declared a disclosable pecuniary interest in Agenda Item No. 10 Pre Application Presentation for amendments to approved Leeds City College Building (Application No.16/05468/FU) on land at Quarry Hill, Leeds. Councillor Heselwood informed the Panel that she was employed by the college. During consideration of the item she withdrew from the meeting and took no part in the discussion or voting thereon (Minutes No. 177 refers)

 

172.

Apologies for Absence

To receive apologies for absence (If any)

Minutes:

Apologies for absence were received from Councillors B Selby

 

Councillors: S McKenna was in attendance as a substitute

 

 

173.

Minutes of the Previous Meeting pdf icon PDF 108 KB

To consider and approve the Minutes of the previous meeting held on 27th April 2017.

 

(Copy attached)

Minutes:

With reference to Minute No.164 and the reference to affordable housing provision. Councillor Leadley requested that the minute be amended to read as follows;

 

Affordable housing provision at 5%, the applicant was willing to consider a number of options for on-site delivery for this Private Rented Sector scheme including provision through a Social Registered Landlord or alternatively the possibility of on-site management directly by the operator.

 

 

RESOLVED – That, with the inclusion of the above, the minutes of the previous meeting held on 27th April 2017 were accepted as a true and correct record.

 

174.

Matters Arising

To consider any matters arising from the minutes of the previous meeting.

Minutes:

Regeneration Proposals for the Whitehall Road area, Leeds 1 – With reference to Minute No.164 of the previous meeting and the suggestion by the Chief Planning Officer for Members to visit the Whitehall Road area to be informed of the wider regeneration proposals for the area.

 

The Chair reported that at the site visit earlier today Members did take the opportunity to visit the Whitehall Road area. Members were briefed on a number of exciting proposals, Members found the visit useful and informative.

 

The Chair, on behalf of Members expressed their thanks and appreciation to Daljit Singh, Team Leader and Paul Kendall, Principal Planner, Central Area Team for their work in setting up the visit.

175.

Application No. 16/07938/OT: Variation of conditions 4, 23, 24, 25, 26, 27 and 28 of permission 15/06583/OT relating to the retail floorspace mix and associated matters at land between Barrowby Lane and Manston Lane, Thorpe Park, Leeds, LS15 8ZB pdf icon PDF 4 MB

To consider a report by the Chief Planning Officer which sets out details of a variation of conditions 4, 23, 24, 25, 26, 27 and 28 of permission 15/06583/OT relating to the retail floorspace mix and associated matters at land between Barrowby Lane and Manston Lane, Thorpe Park, Leeds, LS15 8ZB

 

 

(Report attached)

Minutes:

With reference to the meeting of 17th December 2015 and the decision to approve the application (15/06583/OT) subject to the satisfactory outcome of the additional sequential/impact assessment information. The Chief Planning Officer now submitted a report which set out details of a variation of conditions 4, 23, 24,26, 27 and 28 of that permission, relating to the retail floorspace mix and associated matters at land between Barrowby Lane and Manston Lane, Thorp Park, Leeds, LS15 8ZB

 

Site photographs and plans were displayed and referred to throughout the discussion on the application.

 

The Chief Planning Officer together with the applicant’s representatives addressed the Panel, speaking in detail about the proposal and highlighted the following:

 

·  The application sought to vary the retail conditions of the most recent outline permission (the ‘cinema permission’ ref: 15/02217/OT) to respond positively to occupier interest and requirements. In particular, the ability to attract Marks and Spencer’s (M&S) to Thorpe Park from its current location in Cross Gates was a key requirement in terms of securing other retailers to the site and at present Condition 26 of the cinema permission currently prevents this from happening, as it seeks to ensure that retailers, who have occupied units over 500 sq.m Gross External Area (GEA) in Cross Gates, Garforth or Rothwell Town Centres, within the preceding six months, do not occupy floorspace within the Thorpe Park development.

·  This application also sought an increase in the retail GEA within the approved layout from 18,000 sqm to 21,499 sqm. At the time of the earlier outline proposals assessments and assumptions had to be made about anticipated retail occupiers. Occupiers were now clearer as tenancy agreements with occupiers were signed, and as occupiers sign agreements their front and back of house floorspace requirements were also becoming clearer. This has led the applicant to seek to an increase in the GEA, which largely related to back of house operations, such as storage. The application also proposes a modest increase in net sales floorspace from 12,800 sqm to 13,099 sqm (an increase of 299 sqm).

 

·  The variation sought were set out in paragraphs 2.3 – 2.9 of the submitted report

·  All proposals were within the existing form and footprint

·  The impact of the new proposals was less than the consented scheme

·  No third party representations or objections had been received

·  Ward Members had been consulted

 

 

Member’s questions raised the following issues:

 

·  Referring to the history of negotiations, Members queried if the application had been adequately publicised

·  Was there a new planning permission required for the proposed Manston Lane Link Road (MLLR) 

 

In responding to the issues raised, the applicant’s representatives confirmed that the application had been publicised and that there was a need to renew the planning permission required for the proposed (MLLR) but only the East – West section.

 

In offering comments, Members raised the following issues:

 

·  There was concern expressed about the level of car parking, were 911 spaces adequate

·  The proposed height of MLLR in some  ...  view the full minutes text for item 175.

176.

Application Nos:16/07714/FU and 16/07734/LI - Hybrid planning application for the restoration and reuse of Monk Bridge viaduct for A1, A2, A3, A4, A5 and D1 uses (up to 4380 sqm); erection of three blocks of 307 apartments (storey heights between 11-13), creation of open space, landscaping and car parking; outline application for two blocks of residential developments 13-21 storeys and Listed Building Application for the repair and refurbishment of viaduct for A1, A2, A3, A4, A5 and D1 uses and connections to associated residential buildings, open space, landscaping and parking areas at Doncaster Monk Bridge Whitehall Road, Lower Wortley Leeds LS12 1BE pdf icon PDF 4 MB

To consider a report by the Chief Planning Officer which sets out details of a

hybrid planning application for the restoration and reuse of Monk Bridge viaduct for A1, A2, A3, A4, A5 and D1 uses (up to 4380 sqm); erection of three blocks of 307 apartments (storey heights between 11-13), creation of open space, landscaping and car parking; outline application for two blocks of residential developments 13-21 storeys and listed building application for the repair and refurbishment of viaduct for A1, A2, A3, A4, A5 and D1 uses and connections to associated residential buildings, open space, landscaping and parking areas at Doncaster Monk Bridge Whitehall Road, Lower Wortley Leeds LS12 1BE

 

 

(Report attached)

Minutes:

The Chief Planning Officer submitted a report which set out details of a hybrid planning application for the restoration and reuse of Monk Bridge viaduct for A1, A2, A3, A4, A5 and D1 uses (up to 4380 sqm); erection of three blocks of 307 apartments (storey heights between 11-13), creation of open space, landscaping and car parking; outline application for two blocks of residential developments 13-21 storeys and listed building application for the repair and refurbishment of viaduct for A1, A2, A3, A4, A5 and D1 uses and connections to associated residential buildings, open space, landscaping and parking areas at Doncaster Monk Bridge Whitehall Road, Lower Wortley Leeds,

LS12 1BE

 

Site photographs and plans were displayed and referred to throughout the discussion on the application.

 

The Chief Planning Officer together with the applicant’s representatives addressed the Panel, speaking in detail about the proposal and highlighted the following:

 

·  The site measures approximately 1.7 hectares and contains the Grade II listed former railway viaduct along the southern boundary with the land to the north being cleared.

·  The site is located to the southwest of the commercial core of the city centre but within the defined city centre boundary. The Leeds Liverpool Canal is to the east of the site with the railway line to the west. There is a mix of residential, commercial and industrial activities in the surrounding area.

·  The viaduct was constructed in 1846 for the Leeds and Thirsk Railway Company. The viaduct has not been in use since the 1960s when the former Wellington train station closed and was subsequently demolished.

·  The access roads to the commercial plots south of the viaduct have also been constructed and connected to Whitehall Road, one of the main distributor roads serving Leeds City Centre.

·  The proposed development is for up to 607 apartments in five buildings. The three western buildings (A,B and C) will provide 307 apartments intended to be made available to the Private Rented Sector (PRS) with the other two buildings (D and E) providing up to 300 units for open market sale. The 307 PRS units are applied for in full along with the commercial elements mainly contained within the railway arches with outline permission being sought for the open market dwellings.

·  Buildings A,B and C would be between 12 and 14 storeys in height. The 307 dwellings sought via full application are 150 x 1 bedroom, 141 x 2 bedroom and 16 x 3 bedroom apartments.

·  Buildings D and E are proposed in outline with maximum heights and footprint to be agreed at this stage. Building E is closet to the canal and is proposed to range in height between 18 and 21 storeys, with Building D ranging in height between 12 and 14 storeys.

·  The listed viaduct would be repaired and would be enhanced to provide a new elevated landscaped public park that would connect to the Wellington Place development to the east.

·  56 car parking spaces beneath blocks A,B and C were  ...  view the full minutes text for item 176.

177.

Pre-application presentation for amendments to approved Leeds City College building (application reference 16/05468/FU), on land at Quarry Hill, Leeds pdf icon PDF 2 MB

To consider a report by the Chief Planning Officer which sets out details of a

pre-application presentation for amendments to approved Leeds City College building (application reference 16/05468/FU), on land at Quarry Hill, Leeds

 

(Report attached)

Minutes:

With reference to the meeting of 17th November 2016 and the decision to approve the application subject to the satisfactory resolution of outstanding matters and conditions (Ref No.16/05468/FU). The Chief Planning Officer submitted a report which sought the views of Members on a series of amendments to the overall scale and design of the buildings. 

 

Site photographs and plans were displayed and referred to throughout the discussion of the application.

 

The Chief Planning Officer together with the applicant’s representatives addressed the Panel, speaking in detail about the revised proposal and highlighted the following:

 

The proposed amendments to the approved scheme were summarised as follows:

 

Phase 1

 

·  A reduction in floor to floor levels from 4.1m to 3.6m and omission of levels 7 and 10 to the 2no. higher blocks on Eastgate (5 storeys to a maximum of 8 storeys, rather than 10 storeys);

·  Re-allocation of space removed from levels 7 and 10 to the courtyard terrace on level 02;

·  Reduction of parapet heights from 3000mm to 1500mm at lowest point to the 3no. blocks on Eastgate;

·  Removal of perforated anodised aluminium and replacement with frameless glazing with fritted/etched imagery on glass. This would create a similar effect to the aluminium with the potential to tie in with college branding;

·  Reduction in the width of the fins from 450mm to 300mm in single colour in the bronze spectrum;

·  Changes to the internal courtyard elevation modified to even out the

  proportion of glazing (50%) to cladding (50%). The cladding is   proposed as a flat panel rainscreen aluminium system in a gold/bronze   colour (lighter than bronze fins); and

·  The changes have a minor impact on the approved floor area for Phase 1 which increases from 15,480m2 to 15,609m2.

·  Disabled access would be provided from Eastgate

 

Phase 2

 

·  Phase 2 had been revised accordingly, and the overall height reduced, to enable the development to read as a family of buildings. The building height had been amended from 8 and 11 storeys (approved) to 8 and 10 storeys. The taller block on Eastgate has been reduced in height by 10.1m and the 8 storey block reduced by 3.5m.

·  This reduces the overall floor area approved for Phase 1 from 10,000m2 to 9,419m2.

 

It was suggested that the combination of changes to Phase 1 and 2 reduced the overall scale of the buildings in relation to the wider Quarry Hill site, including the Caddick Developments site immediately to the east

 

In response to Members questions the following issues were raised:

 

·  Would the reduction in floor space be sufficient to sustain the future development of the college

·  Had the vehicle egress and exit issues been satisfactorily addressed

·  Was funding in place for Phase 2 of the development

·  Was progress being made on proposals for public realm to tie in with the adjacent Caddick and West Yorkshire Play House developments

 

In providing a response to the above questions the Chief Planning Officer/ applicants representatives said: the reduction in floor space was still sufficient to sustain the future  ...  view the full minutes text for item 177.

178.

PREAPP/17/00098 Pre-application presentation for a proposed outline residential development at Sweet Street, Holbeck, Leeds LS11 9AA pdf icon PDF 609 KB

To consider a report by the Chief Planning Officer which sets out details of a pre application proposal in respect of a proposed outline residential development at Sweet Street, Holbeck, Leeds LS11 9AA

 

(Report attached)

 

Minutes:

The Chief Planning Officer submitted a report which sets out details of a

Pre-application proposal in respect of a proposed outline application for residential development at Sweet Street, Holbeck, Leeds, LS11 9AA.

 

Site photographs and plans were displayed and referred to throughout the discussion of the application.

 

The applicant’s representative addressed the Panel, speaking in detail about the proposal and highlighted the following:

 

 

·  The site was currently a vacant warehouse site in the Holbeck Urban Village area of Leeds South Bank, in the designated City Centre.

·  The site was on the north side of Sweet Street at the junction with Siddall Street.

·  The immediate surrounding context includes The Mint, an 8 storey office building immediately to the east, Manor Mills an 8-9 storey residential development to the north-east, a public square, a single storey telecommunications centre (with permission for office use) to the north, and a single storey warehouse to the west. Along the boundary with the site to the north is a group of approximately 25 partly self-seeded and partly planted rowan and silver birch.

·  The wider context includes the 6-12 storey Dandara residential development, approved at City Plans Panel in 2015, and now under construction, to the east of The Mint. Opposite the site were single storey warehouses, and a temporary surface car park.

·  The immediate surrounding area offers a wide variety of modern architectural styles and materials including red brick, light and dark brown brick, render, copper cladding, glazed balconies, and natural stone. The site lies in flood risk zone 2.

·  The maximum height of the building would be 10 residential storeys, approximately 33m. The footprint would be U-shaped, fronting onto Sweet Street and Siddall Street and the new pedestrian/cycle route to the north, forming a west facing courtyard amenity space. The indicative building footprint would be set back over 8.6m from the boundary to the north, which would allow the provision of the public route and not prejudice the development of the sites to the north.

·  The proposal is for a maximum of 192 dwellings in the following

  Combinations and sizes: 41 x 1 bed (48.5 sqm) 124 x 2 bed (71 sqm)   18 x   2 bed (74 sqm) and 9 x 2 bed (80 sqm)

·  A pedestrian route was proposed along the northern edge of the site, this would be a minimum of 2.5m wide and would feature tree planting as shown on the indicative scheme. This would be added to if neighbouring sites were to come forward for redevelopment at any time in the future, in order to achieve the aspirations for enhanced connectivity within Holbeck.

·  62 car parking spaces would be provided to serve the development

·  5% Affordable Housing contribution (192 dwellings)

In response to Members questions, the following were raised:

 

·  Could the adjacent site be included as part of the development

·  Clarification was required about the ownership of the adjoining land and it’s proposed future use

·  The design of the building (the inverted C shape) why was this shape chosen

 

In responding  ...  view the full minutes text for item 178.

179.

Date and Time of Next Meeting

To note that the next meeting will take place on Thursday 29th June 2017 at 1.30pm in the Civic Hall, Leeds.

Minutes:

RESOLVED – To note that the next meeting would take place on Thursday 29th June 2017 at 1.30pm in the Civic Hall, Leeds