Decisions

Details of officer decisions relating to planning applications.

Decisions published

25/04/2014 - Authorisation of Commercial Transfer Agreement - Ryecroft Primary School form Leeds city Council to The Gorse Academies Trust ref: 41147    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 25/04/2014

Effective from:

Decision:

The Cheif Officer, Strategy, Commissioning and Performance agreed to:
* note the negotiations held with Solicitors acting on behalf of the school, DfE and the Academy Trust; and
* give authority for the Commercial Transfer Agreement to be executed and completed to enable the Academy to open on 1st May 2014.

Wards affected: Farnley and Wortley;

Lead officer: Nigel Wilson


25/04/2014 - Appropriation of the Ryecroft Primary School site from the Department of Environment and housing to the Department of Children's Services ref: 41146    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 25/04/2014

Effective from:

Decision:

The Chief Officer, Strategy, Performance and Commissioning, Children's Services accepts the appropriation of the Ryecroft Primary School site from the Department of environment and Housing following the site being declared surplus to departmental requirements and approval in principle being agreed at April's AMB.

Wards affected: Farnley and Wortley;

Lead officer: Nigel Wilson


25/04/2014 - Approval to commence a procurement for Autodesk subscription, support, training and consultancy. ref: 41145    Recommendations Approved

Decision Maker: Deputy Chief Executive

Decision published: 25/04/2014

Effective from:

Decision:

The Chief Officer, ICT approves the commencement of a procurement for Autodesk subscription, support, training and consultancy with a contract term of two years. In addition, given the is a simple procurement for commoditised products, approval is also given that this procurement is managed by ICT Strategic Sourcing without the use of the standard procurement plan template.

Lead officer: Robert Greaves


02/05/2014 - Award of contract for a Managed Print Service ref: 41115    

 

To approve the award of a contract for the provision of a Managed Print Service to the Council.

 

Decision Maker: Deputy Chief Executive

Decision published: 24/04/2014

Effective from: 13/05/2014

Decision:

 

The Director of Resources approves the award of a contract to Canon (UK) Ltd for the provision of a Managed Print Service.

 

Lead officer: Andrew Byrom


23/04/2014 - Design & Cost Report - Achieving 2 Year Old Project - Minor Capital Works Capital Scheme Number: 16778/REF/000 ref: 41144    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 23/04/2014

Effective from:

Decision:

The Head of Strategic Development and Investment agreed to authorise expenditure of £175,000 from Capital Scheme Number 16778/REF/000 on minor capital building works and equipment at a number of Children's Centres across the city.

Wards affected: (All Wards);

Lead officer: Anne Kearsley


23/04/2014 - Sovereign Square Green Space Tender ref: 41137    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 23/04/2014

Effective from:

Decision:

The Chief Asset Management and Regeneration Officer has approved the selection of a contractor for the new green space at Sovereign Square via the YorBuild Framework and, the evaluation criteria of 60% price and 40% quality for the procurement of the contractor to undertaken the proposed new green space at Sovereign Square.

Wards affected: City and Hunslet;

Lead officer: Jane Cash


23/04/2014 - NACRO Rental Subsidy for Mandela Community Centre ref: 41136    Recommendations Approved

Decision Maker: Assistant Chief Executive (Citizens and Communities)

Decision published: 23/04/2014

Effective from:

Decision:

The Chief Officer Communities approves that the rental fees for NACRO’s use of office space within Mandela Community Centre are discounted to £2,000 for a period of 12 months starting 24th March 2014. It is suggested that the arrangement be reviewed annually to determine whether the letting agreement should continue and that the rate of subsidy is appropriate.

Wards affected: Chapel Allerton;

Lead officer: Sharon Hughes


22/04/2014 - Waiver Report for Internet software relating to the access of Traffic Regulation Order information ref: 41135    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 22/04/2014

Effective from:

Decision:

The Head of Engineering Services approved the waiver of Contract Procedure Rule: 8 between £10K and £100K Intermediate Value Procurement and approved the purchase of Traffweb Software for a period of 3 years extendable annually for a further 6 years.


Wards affected: (All Wards);

Lead officer: Gary Pritchard


22/04/2014 - Objections to the Extension in Pedestrianised Hours in Leeds City Centre Leeds City Council (Traffic Regulation) (Movement Restriction) (No.7) (Order) 2013 ref: 41134    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 22/04/2014

Effective from:

Decision:

The Head of Engineering Services:

i) considered and overruled the objections received to the advertised draft Traffic Regulation Orders; Leeds City Council (Traffic Regulation) (Movement Restriction) (No.7) (Order) 2013;

ii) gave authority to make, seal and implement the Leeds City Council (Traffic Regulation) (Movement Restriction) (No.7) Order 2013, as advertised with an amendment to the loading and unloading exemption from 8:00pm to 7:00pm; and

iii) instructed the City Solicitor to inform the objectors accordingly.

Wards affected: City and Hunslet;

Lead officer: Mark Durham


17/04/2014 - Street Cafe Licensing in Leeds City Centre - Hotel Chocolat - Unit 1.05, Trinity Centre, Boar Lane, Leeds LS1 ref: 41133    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 17/04/2014

Effective from:

Decision:

The Head of Engineering Services:

i) noted the contents of the report; and

ii) approved the application from Hotel Chocolat, for a licence to operate a street café on the highway at Albion Street, Leeds 1 ,as shown on the attached numbered drawing 068B, to expire on the 31 March 2015 and that future licences be renewed annually, subject to satisfactory operation, and with approval from The Chief Officer Highways and Transportation.

Wards affected: City and Hunslet;

Lead officer: Andrew Smith


17/04/2014 - Design and Cost Report for Schools Equipment Leasing Capital Scheme Number: 32003/SCH/000 ref: 41132    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 17/04/2014

Effective from:

Decision:

The Head of Strategic Development and Investment agreed to authorise expenditure of £150,000 for the purchase of furniture and IT equiment for schools from capital scheme number 32003/SCH/000

Wards affected: (All Wards);

Lead officer: Alan Taylor


17/04/2014 - Extension of Contract - Mobile Elevated Working Platforms ref: 41131    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 17/04/2014

Effective from:

Decision:

The Head of Engineering Services approved the extension of the Mobile Elevated Working Platforms Contract for a further 12 months in accordance with its terms and conditions.

Wards affected: (All Wards);

Lead officer: Anne Sweeting


17/04/2014 - Waiver Report for C2 Traffic Data Software and Hosting ref: 41130    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 17/04/2014

Effective from:

Decision:

The Head of Engineering Services:

i) approved the waiver of Contract Procedure Rule: 8 Between £10k and £100k Intermediate Value Procurement; and

ii) approved entering into a contract with Drakewell Computer Systems for continuing support of the C2 data system for a period of 4 years and extendable for a further 4 years.



Wards affected: (All Wards);

Lead officer: Paul Foster


17/04/2014 - 20mph Schemes - Phase 3 - Objection Report ref: 41129    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 17/04/2014

Effective from:

Decision:

The Acting Head of Transport Policy:

i) considered and overruled the objections to Speed Limit Order(s) 10, 15, 16 and 19 2013, and Section 90c Notice relating to the provision of traffic calming on Albert Road, Morley; Servia Hill, Little London; and Weetwood Lane, Weetwood; and

ii) requested the City Solicitor to inform the objectors accordingly.

Wards affected: Armley; Beeston and Holbeck; Bramley and Stanningley; Burmantofts and Richmond Hill; City and Hunslet; Farnley and Wortley; Gipton and Harehills; Guiseley and Rawdon; Headingley; Hyde Park and Woodhouse; Killingbeck and Seacroft; Middleton Park; Morley South; Pudsey; Temple Newsam; Weetwood;

Lead officer: Jonathan Waters


17/04/2014 - Street Cafe Licensing in Otley - Leeds House - Market Place, Leeds, LS21 3AQ ref: 41128    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 17/04/2014

Effective from:

Decision:

The Head of Engineering Services:
i) noted the contents of the report; and

ii) approved the application from Leeds House, for a licence to operate a street café on the highway at Market Place, Otley LS21 3AQ ,as shown on the attached unnumbered drawing, to expire on the 31st March 2015 and that future licences be renewed annually, subject to satisfactory operation, and with approval from The Chief Officer (Highways and Transportation).



Wards affected: Otley and Yeadon;

Lead officer: Kenny Harkis


17/04/2014 - Otley & Yeadon Parking Strategy - Improvement to Parking Restrictions - Objections ref: 41126    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 17/04/2014

Effective from:

Decision:

The Head of Engineering Services:
i) considered and over-ruled the objections received to the advertised draft Otley and Yeadon Traffic Regulation Order (Waiting Restrictions) (No.38) 2012;
ii) gave authority to make, seal and implement the Otley & Yeadon Traffic Regulation Order (Waiting Restrictions) Traffic Regulation Order (No.38) 2012 as advertised; and
iii) requested the City Solicitor to inform the objectors accordingly.

Wards affected: Otley and Yeadon;

Lead officer: Thomas Rudge


17/04/2014 - S278 Highways works associated with new educational campus for Leeds College of Building on the site of the former Yorkshire Chemicals, Black Bull Street, Hunslet Capital Scheme Number: 32087 / 000 / 000 ref: 41125    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 17/04/2014

Effective from:

Decision:

The Head of Engineering Services:

i) noted the principle of the highway works as outlined in Section 3.1 and indicated on drawings referenced: DC/SF/TDS00499/01 and land dedication plan DC/SF/TDS00499/02;
ii) gave authority to negotiate the terms of and enter into an agreement with the developer under the provisions of Section 278 of the Highways Act 1980, whereby the works associated with the development are carried out by this Council at the cost of the developer;
iii) gave authority to implement the works as set out in Section 3.1;
iv) approved an injection of £114,000 into the City Development Capital Programme, to be fully funded by the developer under a Section 278 agreement;
v) gave authority to incur expenditure of £114,000, being £95,000 works costs and £19,000 staff costs, to be fully funded by the developer under a Section 278 agreement;
vi) gave authority to advertise a notice under the provisions of Section 23 of the Road Traffic Regulation Act 1984 notifying of the proposed pedestrian crossing facilities;
vii) approved the proposed amendments to the existing waiting restrictions as described in 3.1.3 on Cudbear Street and Sheaf Street; and
viii) instructed the City Solicitor to advertise a draft Traffic Regulation Order, and, if no valid objections are received, to make, seal and implement the Order as advertised.

Wards affected: City and Hunslet;

Lead officer: Steve Flanagan


16/04/2014 - Housing Leeds Property and Contracts Restructure 2014 ref: 41124    

The Director of Environment and Housing approved Phase 2 of the Housing Leeds Property and Contracts Restructure.

Appendix L  to this report has been marked as confidential under Access to Information Procedure Rules 10.4 (3) on the basis that it contains information relating to the financial or business affairs of any particular person (including the authority holding that information) which, if disclosed to the public, would, or would be likely to prejudice the commercial interests of that person or of the Council.

 

Decision Maker: Director of Environment and Housing

Decision published: 16/04/2014

Effective from:

Decision:

The Director of Environments and Housing agreed to approve the proposed first phase of the service restructure PO5 and above for Property and Contracts (Housing Leeds).

Wards affected: (All Wards);

Lead officer: Steve Hunt


16/04/2014 - Variation to contract for Leeds and York Partnership NHS Foundation Trust (LYPFT) block contract ref: 41123    Recommendations Approved

Decision Maker: Director of Public Health

Decision published: 16/04/2014

Effective from:

Decision:

To seek approval for a contract variation for the removal of the Psycho-sexual counselling service valued at £148,676 from the Leeds and York Partnership NHS Foundation Trust from 1st April 2014. This is to enable Leeds Clinical Commissioning Groups to commission this service as part of their commissioning responsibilities from 1st April 2014 onwards.

Wards affected: (All Wards);

Lead officer: Lynne Hellewell


15/04/2014 - Support to the Leeds Rail Growth Package (LRGP) — Agreement of Legal Documentation ref: 41122    Recommendations Approved

Decision Maker: Deputy Chief Executive

Decision published: 15/04/2014

Effective from:

Decision:

In accordance with the delegation agreed at the meeting of the Executive Board on the 19th June 2013, the Deputy Chief Executive, the Director of City Development and the City Solicitor approved the terms of legal documents so as to provide assistance to GMV Twelve Limited to facilitate the delivery of the LRGP.
Executive Board at its meeting on the 19 June 2013 approved a report proposing that the Council provide support to the LRGP. It set out that the Council had been approached by CEG Ltd who are managing the development of the former Kirkstall Forge site on behalf of the owner of the site GMV Twelve Ltd to provide financial assistance to enable them to meet their planning obligations to contribute to the LGRP and to carry out associated highway infrastructure access works at the Kirkstall Forge Site. The report recognised that the proposed Kirkstall Forge Scheme (both the construction of the rail halt and the development of the adjoining land) is of strategic importance to the city and the city region and that there are sound economic reasons for the Council supporting GMV Twelve in meeting their obligations. That report also included agreed heads of terms, which provides for the Council's investment to be repaid in accordance with a schedule of repayments over a 10 year period to commence 6 months after the first sale of a residential property at the site, but no later than 1st April 2018.
The Deputy Chief Executive, the Director of City Development and the City Solicictor in taking their decision received a report setting out the terms of the legal agreement, Appendix A and B of this report are exempt from publication as they contains information relating to the financial and business affairs of GMV Twelve and the Council. The public interest in maintaining the exemption in relation to this matter outweighs the public interest in disclosing the information by reason of the fact that Appendix A and B contains information and financial details which, if disclosed, would adversely affect the business of the Council and GMV Twelve.

Wards affected: Bramley and Stanningley; Horsforth; Kirkstall;

Lead officer: Doug Meeson


15/04/2014 - Award for Domestic Heating Tender within Housing Leeds for labour and the purchase of materials through the procure plus framework ref: 41121    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 15/04/2014

Effective from:

Decision:

The Director of Property & Contracts Housing Leeds agreed to the award of the Domestic heating contract (Labour & Material) following a formal procurement exercise with the Efficiency North procure plus framework.
That similar service is provided by LCC’s ISP (enterprise Leeds) to the approximate value of £500k per annum under a Service Level Agreement.

Wards affected: (All Wards);

Lead officer: Mick Field


15/04/2014 - Award Fire Safety Equipment Servicing (Hardware) Contract. Framework Name/Details: PRO5 Framework SWCE-8XMBCBE ref: 41120    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 15/04/2014

Effective from:

Decision:

The Chief Officer Property & Contracts Housing Leeds agreed to award a service provider to Supply and Maintain Fire Fighting Equipment (Hardware; Dry/Wet Risers and Automatic Sprinklers Systems) within the Social Housing Stock of Housing Leeds.

Wards affected: (All Wards);

Lead officer: Patrick Gibbons


15/04/2014 - Request to declare Rycroft Primary School site surplus to Departmental requirements and grant approval to appropriate the site from the Department of Environment and Housing to the Department of Children’s Services. ref: 41119    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 15/04/2014

Effective from:

Decision:

The Chief Officer of Property and Contracts agreed to declare Rycroft Primary School site surplus to Departmental requirements and granted approval to appropriate the site from the Department of Environment and Housing to the Department of Children’s Services

Wards affected: Farnley and Wortley;

Lead officer: Charlotte Underwood


15/04/2014 - Request to declare 2 Autumn Terrace surplus to Departmental Requirements ref: 41118    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 15/04/2014

Effective from:

Decision:

The Chief Officer of Property and Contracts agreed to declare 2 Autumn Terrace surplus to Departmental Requirements for the purpose of selling to Unipol on terms to be agreed by the Director of City Development.

Wards affected: Hyde Park and Woodhouse;

Lead officer: Charlotte Underwood


14/04/2014 - Waste Management Reorganisation 2014 ref: 41117    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 14/04/2014

Effective from:

Decision:

The Director of Environment and Housing agreed to approve the report and the implementation of the proposed structure.

Wards affected: (All Wards);

Lead officer: Susan Upton


14/04/2014 - Housing Leeds Housing Management Restructure 2014 ref: 41116    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 14/04/2014

Effective from:

Decision:

The Director of Environment and Housing agreed to approve the proposed phase 2 of the service restructure (PO5 and above) for Housing Management (Housing Leeds).

Wards affected: (All Wards);

Lead officer: Liz Cook


11/04/2014 - Passenger Transport, vehicle replacements 2014-15 ref: 41112    Recommendations Approved

Decision Maker: Deputy Chief Executive

Decision published: 11/04/2014

Effective from:

Decision:

The Chief Officer CEL, approved the request to award the tender for the purchase of 36 replacement minibuses for Passsenger Transport as part of the 2014-15 replacement programme at a cost of 1.772m

Wards affected: (All Wards);

Lead officer: Julie Hatton


23/04/2014 - Leeds City Region Skills Hub - Procurement Exercise ref: 41114    

Decision to undertake a procurement exercise to secure the services of an organisation to provide: a skills brokerage service to businesses; to manage the deployment of a £15m Skills Fund to businesses in the Leeds City Region; and to ensure fund compliance with Skills Funding Agency and EU

Decision Maker: Deputy Chief Executive

Decision published: 11/04/2014

Effective from: 01/05/2014

Decision:

Decision to undertake a procurement exercise to secure the services of an organisation to provide: a skills brokerage service to businesses; to manage the deployment of a £15m Skills Fund to businesses in the Leeds City Region; and to ensure fund compliance with Skills Funding Agency and EU requirements.

Wards affected: (All Wards);

Lead officer: Martin Green


23/04/2014 - Council wide Fresh Meat Contract to be added to the forward plan ref: 41111    Recommendations Approved

To award a Council wide contract for the supply of fresh meat

Decision Maker: Deputy Chief Executive

Decision published: 11/04/2014

Effective from: 01/05/2014

Wards affected: (All Wards);

Lead officer: Mandy Snaith


17/04/2014 - Planned Highway Asset Maintenance Programme 2014-15 ref: 41100    

To approve the Highway Asset Maintenance Works required for 2014/15. 

Amount covered by report approx £19.9 million

 

Decision Maker: Director of City Development

Decision published: 09/04/2014

Effective from: 29/04/2014

Decision:

The Chief Officer (Highways and Transportation):

i)  gave authority to incur expenditure of £6,508,000 (£4,702,547 works costs and £1,047,453 internal staff and partner design fee costs plus £758,000 inspection, assessment and asset management fees) funded from the 2014/15 Local Transport Plan Capital Grant Allocation;

ii)  gave authority to incur expenditure of £10,000,000 (£8,928,570 works costs and £1,071,430 staff fee costs) funded from Leeds City Council Capital Resources £9,295,000 and a Highways Maintenance Government Grant £705,000;

iii)  approved the addition of the schemes listed in appendix B and C to this report into the Highways Assets Capital Programme for 2014/15;

iv)  noted the addition of schemes listed in appendix D to this report into the Highways Assets Planned Revenue Programme for 2014/15; and

v)  The Head of Service shall be responsible for implementation of the attached programmes of work within the 2014/15 financial year.

Wards affected: (All Wards);

Lead officer: Richard Hobson


17/04/2014 - Annual Pedestrian Crossing Review 2014 ref: 41101    

To approve the proposals in the report as the basis for the 2014/15 programme for introducing new pedestrian crossings.

Decision Maker: Director of City Development

Decision published: 09/04/2014

Effective from: 29/04/2014

Decision:

The Chief Officer (Highways and Transportation):

i)  noted the contents and recommendations of this report and the procedures carried out in respect of conducting the annual pedestrian crossing review;

 

ii)  approved the recommendations as set out in Section 3 of the report  and in Appendix 1 as the basis for the 2014/15 programme for introducing new pedestrian crossings, subject to detailed scheme approval and programming of the works; and

 

iii)  agreed the recommendations in respect of the provision of externally funded crossing facilities.

 

Wards affected: Various;

Lead officer: Kasia Speakman


11/04/2014 - Approval for extension of contract LCC22990A for provision of event stewarding & security services ref: 41076    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 08/04/2014

Effective from: 11/04/2014

Decision:

The Chief Officer Culture & Sport has approved the extension of contract LCC22990 for the provision of event stewarding & security for a further 2 x 12 month period

Wards affected: Various;

Lead officer: Craig Shackleton


16/04/2014 - Request for Adult Social Care to enter into a two year contract with Alzheimer's Society to deliver a day service and an outreach service for younger people with dementia ref: 41077    

The Director of Adult Social Services is requested to waive Contract Procedure Rules 9.1 and 9.2 to enter into a two year contract for two dementia services provided by the Alzheimer’s Society - a day service and an outreach service for young people with dementia, with effect from 1st October 2014 to 30th September 2014.

Decision Maker: Director of Adult Social Services

Decision published: 08/04/2014

Effective from: 26/04/2014

Decision:

The Deputy Director, Adult Social Care, approved the recommendation to waive CPRs 9.1 and 9.2, using the authority set out in CPR 1.3, to enter into a contract with Alzheimer’s Leeds for the provision of; a day opportunities and an outreach service for younger people with dementia for 2 years from 1st October 2014 to 30th September 2016.  The contract has an annual value of £180,500 with the addition of £112,000 transferred to ASC via a s256 agreement from NHS - provisions are available within the agreed budgets. The Commissioning Officer will oversee implementation of the contract.

Wards affected: (All Wards);

Lead officer: Mick Ward


11/04/2014 - Approval of city-wide crime prevention contract 2014-2017 ref: 41060    

Awarding of the contracts for the youth crime commission.

Decision Maker: Director of Children's Services

Decision published: 03/04/2014

Effective from: 23/04/2014

Decision:

The Director of Children’s Services agreed to approve the award of the Youth Inclusion Commission contract to Barca-Leeds as the lead practitioner in partnership with Nacro at a maximum cost of £500k per annum. The contract length will be 2 years and 8 months, with the option to extend for a period of up to 12 months.

Wards affected: (All Wards);

Lead officer: Louise Atherton