Issue - meetings

Design and Cost Report and Tender Acceptance for the expansion project at Moor Allerton Hall Primary School for September 2019

Meeting: 13/02/2019 - Executive Board (Item 150)

150 Design & Cost Report and Tender Acceptance Report for the Learning Places expansion of Moor Allerton Hall Primary School pdf icon PDF 73 KB

To consider the report of the Director of Childrens & Families on the proposed expansion of Moor Allerton Hall Primary School and the necessity to enter into a Joint Contracts Tribunal (JCT) 2016 contract with Leeds D&B One Co. for the delivery of critical works required to adhere to the expansion programme. The report seeks the necessary approvals to enter into contracts and incur expenditure required to deliver the scheme.

 

Additional documents:

Minutes:

Further to Minute No. 124, 19th December 2018, the Director of Childrens and Families submitted a report on the proposed expansion of Moor Allerton Hall Primary School with specific reference to the proposed entering into a Joint Contracts Tribunal (JCT) 2016 contract with Leeds D&B One Co. for the delivery of critical works which were required to adhere to the expansion programme. In addition, the report sought the necessary approvals to enter into related contracts and to incur the necessary expenditure.

 

Responding to a Member’s enquiry, the Board discussed and received further information on the estimated overall costings for the scheme, and what the estimated costs, as detailed within the submitted report, were comprised of.

 

RESOLVED –

(a)  That the expenditure of £5,653,729.02 from capital scheme number 32737/MAL/000 for the construction work and associated fees for the expansion of Moor Allerton Hall Primary School, necessary for occupation from September 2019, be approved;

 

(b)  That the acceptance of the tender submitted via the Leeds Local Education Partnership in the sum of £4,730,797 inclusive of all professional design fees incurred by the appointed contractor, development costs and surveys incurred by the contractor, be authorised; with it being noted that this figure includes the previously approved sum of £355,503.43 for the completion of the necessary ‘Early Works’ packages, and that the release of funding for the construction costs will be subject to valuations completed and validated by NPS Ltd. (Leeds);

 

(c)  That the requirement to enter into a contractual agreement with Leeds D&B One Co. in order to deliver the development at Moor Allerton Hall Primary School, be authorised, which will take the form of a JCT 2016 head contract between the authority and Leeds D&B One Ltd. for the sum of £4,730,797;

 

(d)  That approval be given to the entering intoa deed of variation with Environments for Learning Leeds PFI One Limited, in order to exclude the existing service road across Allerton Fields from the PFI site for Allerton Grange School in order that such access road can be remodelled as part of the development at Moor Allerton Hall Primary School;

 

(e)  That approval be given for the resolutions, as minuted, from this report to be exempted from the ‘Call In’ process, on the grounds of urgency, as detailed within sections 4.5.1 – 4.5.4 of the submitted report;

 

(f)  That it be noted that the estimated scheme cost of £5,653,729.02 includes: £4,730,797 for construction works (this is the contract / tender submission value inclusive of £355,503.43 of previously approved ‘Early Works’ costs); professional fees and survey costs of £509,285; £30,000 for loose furniture and equipment; £55,500 for supporting costs and a client held contingency commensurate to the scale and complexity of the project; with it also being noted that the construction cost includes £358,694.00 of ‘on-site’ Highways upgrades to facilitate the conversion of the PFI service road into a drop-off loop serving both Moor Allerton Hall and Allerton Grange School, with it being further noted that  ...  view the full minutes text for item 150