Details of officer decisions relating to planning applications.
Decision Maker: Head of Design Services
Decision published: 04/04/2014
Effective from:
Decision:
The Chief Officer of Property and Contracts
agreed in principle to approve the surrender of the ground lease on
101 Lincoln Green Road and the re-grant of a new lease, subject to
Planning and Highways approvals.
Wards affected: Burmantofts and Richmond Hill;
Lead officer: Charlotte Underwood
Decision Maker: Director of Environment and Housing
Decision published: 04/04/2014
Effective from:
Decision:
The Whinmoor Public House is closed and has
been subject to anti-social behaviour. It is held by way of a long
leasehold interest. The Chief Property and Projects Officer has
approves :
(a) The terms provisionally agreed for the acquisition by the
Council of the leasehold interest and : (b) That the cost of the
acquisition and demolition be met from the Council’s Housing
Revenue Account. (c) That the site of the public house be declared
surplus to Council requirement subject to further consideration of
the options for delivering affordable housing.
Wards affected: Cross Gates and Whinmoor;
Lead officer: Andrew Gledhill
Decision Maker: Director of Environment and Housing
Decision published: 04/04/2014
Effective from:
Decision:
The Chief Officer Property and Contracts
agreed to the procurement of a service provider to supply and
maintain fire fighting equipment (hardware; dry/wet risers and
automatic sprinklers systems) within the social housing stock of
Housing Leeds
Wards affected: (All Wards);
Lead officer: Patrick Gibbons
Decision Maker: Deputy Chief Executive
Decision published: 04/04/2014
Effective from:
Decision:
To waive Contracts Procedure Rules No 8.1 and
8.2 – Intermediate value procurement and award a 12 month
contract to ESRI UK Ltd for the
Lead officer: Stephen Westerman
Decision Maker: Chief Planning Officer
Decision published: 04/04/2014
Effective from:
Decision:
The Chief Planning Officer has:
• authorised the designation of Adel Neighbourhood Forum
pursuant to Section 61F of the Town and Country Planning Act
1990.
Wards affected: Adel and Wharfedale;
Lead officer: Heather Suggate
Decision Maker: Director of City Development
Decision published: 04/04/2014
Effective from:
Decision:
The Chief Officer (Resources and Strategy)
approved the Council entering into the refreshed WTY Leeds Hosting
Agreement on the terms set out in the delegated decision
report.
Wards affected: (All Wards);
Lead officer: Cluny Macpherson
Decision Maker: Director of Public Health
Decision published: 03/04/2014
Effective from:
Decision:
The post-holder has approved the
Sub-Delegation Scheme attached at Appendix 1 to the attached
report.
The fact that a function has been delegated to an officer does not
require that officer to give the matter his/her personal attention
and that officer may arrange for such delegation to be exercised by
an officer of suitable experience and seniority.
Lead officer: Rachael Oakley
Decision Maker: Director of Children's Services
Decision published: 03/04/2014
Effective from:
Decision:
The Chief Officer of Children's Social Work
approved the waiver of the following Contracts Procedure
Rule(s):
Contracts Procedure Rules No. 8.1 and 8.2 - Intermediate value
procurements and award contracts to Insitute of Education and the
University of York in the sum of £25,000. The contract shall
commence on the 27th March 2014 and expire on the 31st March 2015
(with the option to extend for a period of 12 months, for a further
£25,000, such option not to be taken up more than
twice).
Wards affected: (All Wards);
Lead officer: Mary Brittle
Decision Maker: Director of City Development
Decision published: 03/04/2014
Effective from:
Decision:
The Chief Asset Management and Regeneration
Officer has given approval to acquire the site of 4 Bawn Vale
Farnley Leeds LS12 by negotiation, at auction or by using CPO
powers .
Wards affected: Farnley and Wortley;
Lead officer: Mike Ross
Decision Maker: Director of City Development
Decision published: 03/04/2014
Effective from:
Decision:
The Chief Asset Management and Regeneration
Officer has approved the terms for the acquisition of the house at
7 Manor Farm Green.
Wards affected: Middleton Park;
Lead officer: Karen Hocker
Decision Maker: Director of City Development
Decision published: 03/04/2014
Effective from:
Decision:
The Chief Asset Management and Regeneration
Officer has given approval to declare land to the rear of 20-26
Queen Square, Leeds, surplus to the Council’s requirements
and to approve terms, as outlined in the confidential appendix of
this report, for its sale on a one to one basis to the adjoining
owner.
Wards affected: City and Hunslet;
Lead officer: James Child
Decision Maker: Director of City Development
Decision published: 03/04/2014
Effective from:
Decision:
The Chief Asset Management and Regeneration
Officer has confirmed that the subject sites are surplus to the
requirements of the Council and approves the invitation of offers
for their sale on the open market for housing development, with any
offers received being reported back for consideration.
Wards affected: Middleton Park;
Lead officer: Mike Ross
Decision Maker: Director of City Development
Decision published: 03/04/2014
Effective from:
Decision:
The Chief Asset Management and Regeneration
Officer has approved the terms for the acquisition of the house at
12 Broom Mount.
Wards affected: Middleton Park;
Lead officer: Karen Hocker
Awarding of the contracts for the youth crime commission.
Decision Maker: Director of Children's Services
Decision published: 03/04/2014
Effective from: 23/04/2014
Decision:
The Director of Children’s Services agreed to approve the award of the Youth Inclusion Commission contract to Barca-Leeds as the lead practitioner in partnership with Nacro at a maximum cost of £500k per annum. The contract length will be 2 years and 8 months, with the option to extend for a period of up to 12 months.
Wards affected: (All Wards);
Lead officer: Louise Atherton
Decision Maker: City Solicitor
Decision published: 02/04/2014
Effective from:
Decision:
The City Solicitor approved the updated Parish
and Town Council Charter, following the annual review.
Wards affected: (All Wards);
Lead officer: Andrea Holgate
To approve capital expenditure of £1.1M on essential corporate ICT hardware upgrades for 2014/15. This principally incorporates important data centre improvements, the refresh of old end user devices, the replacement of aging server technology and the replacement of end of life network switches. This includes the human resources effort to install and commission.
Decision Maker: Deputy Chief Executive
Decision published: 02/04/2014
Effective from: 18/04/2014
Decision:
The Deputy Chief Executive has given approval to incur capital expenditure of £1.1M on essential corporate ICT hardware upgrades for 2014/15. This principally incorporates the replacement of some of our aging Cisco network switches and refreshing elements of our MS Windows virtual server farm. Decommissioning the 3rd floor Civic datacentre and refreshing old end of life ‘end user’ devices. This programme involves the engagement of internal and external resources and the associated project management to implement this business critical hardware.
Lead officer: David Maidment
To approve capital expenditure of £3.1M on essential corporate ICT software upgrades for 2014/15. This principally incorporates important elements of software e.g. old and unsupported desktop software, website and intranet development, central server software upgrades, essential development and testing tools, mobile device management and security. This includes the human resources effort to install and commission.
Decision Maker: Deputy Chief Executive
Decision published: 02/04/2014
Effective from: 18/04/2014
Decision:
The Deputy Chief Executive has given approval to incur capital expenditure of £3.1M on essential corporate ICT software upgrades for 2014/15. Microsoft Office Communicator will be upgraded from v2007 to MS Lync 2013. Important Website and Intranet developments. Upgrade MS Windows Server and MS SQL Server to v2012. Oracle upgrade to v.11g. Upgrade general software e.g. MS Internet Explorer, Adobe Reader, Visio, MS Project. Develop a Windows 8.1 image for trial on tablet devices and mobile phones. Upgrade the core software used to develop and support our internal systems i.e. MS Team Foundation Server, Application Lifecycle Manager, Web Development Tools, Visual Studio 2013. Smartphone and ‘Bring Your Own Device’ device software management will also be upgraded. Important IT Testing tools will be introduced. This involves the engagement of internal and external resources and the associated project management to implement this business critical software.
Lead officer: David Maidment
Decision Maker: Deputy Chief Executive
Decision published: 01/04/2014
Effective from:
Decision:
Approval to waive Contract Procedure Rules 8.1
and 8.2 and enter into contract with Mandant Solutions Limited for
the provision of SAP DBA support for the ESS/MSS project.
Lead officer: Bev Fisher
Decision Maker: Director of Public Health
Decision published: 01/04/2014
Effective from:
Decision:
To seek approval from the Director of Public
Health to award a contract to Black Health Agency for Lot 1 (Black
African communities) of the HIV prevention and community testing
service.
To seek approval from the Director of Public Health to award
Yorkshire MESMAC a contract for Lot 2 (Men that have Sex with Men)
of the HIV prevention and community testing service.
Wards affected: (All Wards);
Lead officer: Brenda Fullard
Decision Maker: Chief Planning Officer
Decision published: 01/04/2014
Effective from:
Decision:
The Chief Planning Officer has authorised the
designation of the Holbeck Neighbourhood Forum pursuant to Section
61F of the Town and Country Planning Act 1990.
Wards affected: Beeston and Holbeck;
Lead officer: Ian Mackay
Decision Maker: Director of City Development
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer (Highways and
Transportation):
i) noted the contents of this report;
ii) gave authority to advertise a series of Speed Limit Orders for
the provision of a number of 20mph zones as shown on drawings
TM-00-CSH-HB-01 to 04, any unresolved objections will be reported
to Highways and Transportation Board;
iii) gave authority to advertise a notice under the provisions of
Section 90C of the Highways Act 1980 notifying of the proposed
traffic calming features as per the detailed design, any unresolved
objections will be reported to Highways and Transportation
Board;
iv) gave authority to advertise a Traffic Regulation Order to
introduce no stopping restrictions as per detailed design, any
unresolved objections will be reported to Highways and
Transportation Board;
v) Instructed the City Solicitor to:
a) advertise the draft Traffic Regulation Order and Speed Limit
Order as per the detailed design, any unresolved objections will be
reported to Highways and Transportation Board; and
b) advertise all scheme related notices under the provisions of
Section 90C of the Highways Act 1980 notifying of the proposed
traffic calming features as per the detailed design, any unresolved
objections will be reported to Highways and Transportation
Board.
Wards affected: Armley; Bramley and Stanningley; Burmantofts and Richmond Hill; Calverley and Farsley; City and Hunslet; Cross Gates and Whinmoor; Farnley and Wortley; Gipton and Harehills; Hyde Park and Woodhouse; Killingbeck and Seacroft; Pudsey; Temple Newsam;
Lead officer: David O'Donoghue
Decision Maker: Assistant Chief Executive (Citizens and Communities)
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer Communities approves the
rental support grant of £20,061.21 for 39 weeks of lettings
at Ebor Gardens Community Centre for Ebor Gardens Primary School
until 31st March 2015.
Wards affected: Burmantofts and Richmond Hill;
Lead officer: Sarah May
Decision Maker: Assistant Chief Executive (Citizens and Communities)
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer Communities approves a grant
to the Friends of Drighlington Community Library to the value of
£1,860 and waives the notional £5,000 rental income.
This grant is to cover the service charges for a 12 month period
from 1st April 2014. This grant is approved on the condition that
the Friends of Drighlington Library
sign the lease that has been drawn up. This support will be
reviewed in 12 months to determine whether the arrangement should
continue and to agree future conditions of use.
Wards affected: Morley North;
Lead officer: Aretha Hanson
Decision Maker: Assistant Chief Executive (Citizens and Communities)
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer Communities approves a
rental support programme for
leased-out community centres for 2014/15 of up to a total of
£179,017 as set out in the associated report, on the
condition that agreed and signed leases are in place for all
organisations concerned.
Wards affected: Ardsley and Robin Hood; Beeston and Holbeck; Bramley and Stanningley; Chapel Allerton; Farnley and Wortley; Garforth and Swillington; Guiseley and Rawdon; Kippax and Methley; Middleton Park; Wetherby;
Lead officer: Jonathan Sharp
Decision Maker: Director of Children's Services
Decision published: 31/03/2014
Effective from:
Decision:
The Director of Children's Services is
requested to approve the waiver and invocation of the Contract
Procedure Rules as detailed in Appendix 1 of this report to enter
into contracts with the organisations as detailed within Appendix 2
attached to the report.
Wards affected: (All Wards);
Lead officer: Paul Bollom
Decision Maker: Director of Environment and Housing
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer Property and Contracts
(Housing Leeds) in consultation with the Chief Procurement Officer
approved a waiver of CPR 9.1 and agreed to a twelve months
extension of LCC 12000 Construction Services Managed Stores
arrangement from 1st February 2014 to 31st March 2015
Wards affected: (All Wards);
Lead officer: Tony Butler
Decision Maker: Director of Environment and Housing
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer Waste Management has agreed
the reviewed prices charged for the disposal of general and
recyclable waste at the City’s transfer stations
Wards affected: (All Wards);
Lead officer: Elizabeth Behrens
Decision Maker: Director of City Development
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer of Highways and
Transportation:
i) noted the contents of this report; and
ii) approved the waiver of Contract Procurement Rule No 8.1 and 8.2
– Intermediate value procurements to allow Leeds City Council
to appoint Cycle Hoop to supply 16 no. Car Bike Ports without
request for quotes to competitors, and approve the supply of these
at a cost of £64,974.
Wards affected: City and Hunslet;
Lead officer: Mark Robinson
Decision Maker: Director of City Development
Decision published: 31/03/2014
Effective from:
Decision:
The Chief Officer of Highways and
Transportation:
i) noted the contents of this report;
ii) approved the supply of 16 Car Bike Ports at a cost of
£64,974
iii) approved installation and supply of Sheffield Stands and
installation of Car Bike Ports, by Leeds City Council’s own
Highways Maintenance Team, at the locations shown on drawings
CC-716969-CCCP-01, 02 and 03 included in Appendix A and in Appendix
C at cost of £36,560; and
iv) gave authority to incur total expenditure of £106,534,
comprising £101,534 works costs ( as detailed above ), and
£5,000 internal staff fee costs, fully funded from the LTP
Transport Policy Capital Programme.
Wards affected: City and Hunslet;
Lead officer: Mark Robinson
Decision Maker: Director of Adult Social Services
Decision published: 31/03/2014
Effective from:
Decision:
The Director of Adult Social Services,
approved the extension of the Contract to RR Consultancy for an
additional two years to 31st March 2016, as permitted within the
current Contract.
Wards affected: (All Wards);
Lead officer: Judith Kasolo
Decision Maker: Director of Adult Social Services
Decision published: 27/03/2014
Effective from:
Decision:
The Chief Officer, Access and Care, approved
the contents of a report regarding a care plan in respect of a
person with complex care needs, the individual cost of which is up
to £154,960 per annum. It is considered in the public
interest that information contained in the report is exempt from
publication as it relates to a vulnerable citizen of the City and
the actions being taken to enable that person to live independently
in a safe environment.
Lead officer: Michele Tynan
Decision Maker: Director of Children's Services
Decision published: 26/03/2014
Effective from:
Decision:
The Chief Officer, Strategy, Performance and
Commissioning agreed to:
* note the negotiations held with solicitirs acting on behalf of
the school, DfE and the Academy Trust; and
* give authority for the Commercial Transfer Agreement to be
executed and completed to enable the Academy to open 1st April
2014.
Wards affected: Rothwell;
Lead officer: Nigel Wilson
Decision Maker: Director of Environment and Housing
Decision published: 26/03/2014
Effective from:
Decision:
The Director of Environment and Housing agreed
to allocate £160k from the housing revenue account to address
tree issues affecting health, wellbeing and quality of life.
To adopt the approach set out in paragraphs 3.8 and 3.9 as the
basis of allocating spend against this allocation.
Wards affected: (All Wards);
Lead officer: Glen Gorner
Decision Maker: Director of Environment and Housing
Decision published: 25/03/2014
Effective from:
Decision:
The Chief Officer of Property & investment
agreed the Option to compulsory purchase land at 4 Bawn Vale, Leeds
12 under Section 17 of the Housing Act 1985. Completion of the
demolition of 4 Bawn Vale, Leeds 12 and refurbishment of 3 Bawn
Vale, Leeds 12. The other option which was to demolish both
properties was not favoured due to the costs and reservations from
Ward Members and local residents.
Wards affected: Farnley and Wortley;
Lead officer: Jeffrey Dembickjy
The Director of Environment and Neighbourhoods approved the budget allocation for 2014/15
Decision Maker: Director of Environment and Housing
Decision published: 25/03/2014
Effective from: 10/04/2014
Decision:
Disabled Facilities Grant Budget 2014/15
Wards affected: (All Wards);
Lead officer: Rob McCartney
The Director of Environments and Housing agreed to authorise expenditure of £64,413.3k for the delivery of the Council House Investment programme in 2014/15.
Note that within the programme there are existing commitments from 2013/14 which have slipped to 2014/15 which have ATS and are already on site and these total £9396.5k.
Note that the 2014/15 Sanctuary scheme £200k will be presented to Housing Decision Panel in March.
Decision Maker: Director of Environment and Housing
Decision published: 25/03/2014
Effective from: 10/04/2014
Decision:
HRA Council House Investment Programme 2014/15
Wards affected: (All Wards);
Lead officer: Steve Hunt
The Director of Environment and Housing approved the budget allocation for 2014/15
Decision Maker: Director of Environment and Housing
Decision published: 25/03/2014
Effective from: 10/04/2014
Decision:
Private Housing Adaptations (DFG) Contract Arrangements 2014/15
Wards affected: (All Wards);
Lead officer: Rob McCartney
Decision Maker: Director of City Development
Decision published: 24/03/2014
Effective from:
Decision:
The Chief Officer (Highways and
Transportation) approved the extension of the Highways and
Transportation Partnership contract from 31st March 2014 to 30th
June 2014.
Lead officer: Wynne Floyd
The Director of Environment and Housing for Waste Management has approved the extension of the existing contract which deals with the residual wastes collected from the kerbside of Leeds domestic properties subject to negotiations around price resulting in the same or better than current. The extension is to provide a continued outlet for this waste until the PFI Energy from waste facility is fully operational. (Currently scheduled for 2016)
Decision Maker: Director of Environment and Housing
Decision published: 20/03/2014
Effective from: 05/04/2014
Decision:
Extension of residual waste contract
Lead officer: Stephen Holmes
This decision is to seek authority for CEL (Property Maintenance and Corporate Property Management) to carry out a series of joint procurement exercises with Housing Leeds (Construction Services) to procure contractors on framework contracts for a range of works and services to support the Council in the maintenance and small improvement works including refurbishment schemes for housing stock and public buildings.
The procurement exercises will be carried in 5 distinct phases which will start January 2014 and contracts procured through phases 1 to 3 will commence January 2015, while phases 4 and 5 will commence April 2015.
Decision Maker: Deputy Chief Executive
Decision published: 19/03/2014
Effective from: 04/04/2014
Wards affected: (All Wards);
Lead officer: Michael Judge
Expansion of Pooled Budget and Section 75 Agreement between Leeds City Council, Leeds NHS Clinical Commissioning Groups and Leeds Community Healthcare for Leeds Community Equipment Service.
Decision Maker: Director of Adult Social Services
Decision published: 19/03/2014
Effective from: 04/04/2014
Decision:
The Deputy Director, Adult Social Care, approves the recommendations:
· For the Director of Adult Social Services and the Director of Children’s Services to agree to develop and expand the pooled budget for Community Equipment Services to a total of £ £4,833,000 (as outlined in appendix 1). This is from within the existing budgets allocated by partners.
· For the Director of Adult Social Services to agree that Adult Social Care be the Lead Commissioning Organisation and Pooled Fund holder.
· For the Director of Adult Social Services to sign the Section 75 of the National Health Service Act 2006 agreement between Leeds City Council and Leeds NHS Clinical Commissioning Groups for the Commissioning of Community Equipment services.
· For the Director of Adult Social Services to agree to develop and expand the partnership agreement with Leeds Community Healthcare for delivering Leeds Community Equipment Service, with Adult Social Care acting as lead provider.
· For the Director of Adult Social Services to agree that these to come into effect from 1st April 2014 for three years till 31st March 2017. With a recognition that this arrangement may in future form part of the Better Care Fund for Leeds arrangements.
Wards affected: (All Wards);
Lead officer: Mick Ward
Approval to extend the Highways and Transportation Partnership Contract to the 30 September 2015.
Decision Maker: Director of City Development
Decision published: 14/03/2014
Effective from: 09/04/2014
Decision:
Extension of Contract - Highways and Transportation Partnership
Wards affected: (All Wards);
Lead officer: Wynne Floyd
To award the framework contract for the supply of vehicles and specialised equipment with or without maintenance for a period of up to 4 years
Decision Maker: Deputy Chief Executive
Decision published: 14/03/2014
Effective from: 25/03/2014
Decision:
The Chief Officer, Civic Enterprise Leeds, approved the award for the
supply of vehicles with and without maintenance for 4 years with a contract start date of the 1st April 2014
Wards affected: (All Wards);
Lead officer: Carl Snowden
The Chief Officer approved procurement exercise for the supply of frozen foods to Leeds City Council establishments. The contract will run for 3 years from 6th August 2014 to 5th August 2017 with one 12 month extension.
Decision Maker: Deputy Chief Executive
Decision published: 14/03/2014
Effective from: 02/04/2014
Decision:
The Chief Officer approved procurement exercise for the supply of frozen foods to Leeds City Council
Wards affected: (All Wards);
Lead officer: Gillian Banks
Approval to tender a Road Markings Contract
Decision Maker: Director of City Development
Decision published: 13/02/2014
Effective from: 01/04/2014
Decision:
The Head of Engineering Services approved the tender of the Road Markings Maintenance Contract 2014/18.
Wards affected: (All Wards);
Lead officer: Richard Tinker