Decisions

Details of officer decisions relating to planning applications.

Decisions published

04/04/2014 - Request to approve the surrender of the ground lease on 101 Lincoln Green Road and the re-grant of a new lease. ref: 41071    Recommendations Approved

Decision Maker: Head of Design Services

Decision published: 04/04/2014

Effective from:

Decision:

The Chief Officer of Property and Contracts agreed in principle to approve the surrender of the ground lease on 101 Lincoln Green Road and the re-grant of a new lease, subject to Planning and Highways approvals.

Wards affected: Burmantofts and Richmond Hill;

Lead officer: Charlotte Underwood


04/04/2014 - LAND AND PREMISES AT STANKS LANE SOUTH SWARCLIFFE – THE WHINMOOR PUBLIC HOUSE ref: 41070    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 04/04/2014

Effective from:

Decision:

The Whinmoor Public House is closed and has been subject to anti-social behaviour. It is held by way of a long leasehold interest. The Chief Property and Projects Officer has approves :
(a) The terms provisionally agreed for the acquisition by the Council of the leasehold interest and : (b) That the cost of the acquisition and demolition be met from the Council’s Housing Revenue Account. (c) That the site of the public house be declared surplus to Council requirement subject to further consideration of the options for delivering affordable housing.

Wards affected: Cross Gates and Whinmoor;

Lead officer: Andrew Gledhill


04/04/2014 - Request to procure a service provider to supply and maintain fire fighting equipment within the social housing stock of Housing Leeds ref: 41069    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 04/04/2014

Effective from:

Decision:

The Chief Officer Property and Contracts agreed to the procurement of a service provider to supply and maintain fire fighting equipment (hardware; dry/wet risers and automatic sprinklers systems) within the social housing stock of Housing Leeds

Wards affected: (All Wards);

Lead officer: Patrick Gibbons


04/04/2014 - Waiver of Contracts Procedure Rules No 8.1 and 8.2 – Intermediate value procurement in respect of the award a 12 month support contract for the existing corporate GIS system. ref: 41058    Recommendations Approved

Decision Maker: Deputy Chief Executive

Decision published: 04/04/2014

Effective from:

Decision:

To waive Contracts Procedure Rules No 8.1 and 8.2 – Intermediate value procurement and award a 12 month contract to ESRI UK Ltd for the

Lead officer: Stephen Westerman


04/04/2014 - Designation of the Adel Neighbourhood Forum ref: 41068    Recommendations Approved

Decision Maker: Chief Planning Officer

Decision published: 04/04/2014

Effective from:

Decision:

The Chief Planning Officer has:
• authorised the designation of Adel Neighbourhood Forum pursuant to Section 61F of the Town and Country Planning Act 1990.

Wards affected: Adel and Wharfedale;

Lead officer: Heather Suggate


04/04/2014 - Tour de France 2014 Agreements – Sign-Off ref: 41067    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 04/04/2014

Effective from:

Decision:

The Chief Officer (Resources and Strategy) approved the Council entering into the refreshed WTY Leeds Hosting Agreement on the terms set out in the delegated decision report.

Wards affected: (All Wards);

Lead officer: Cluny Macpherson


03/04/2014 - Approval of the Director of Public Health’s Sub-Delegation Scheme ref: 41066    Recommendations Approved

Decision Maker: Director of Public Health

Decision published: 03/04/2014

Effective from:

Decision:

The post-holder has approved the Sub-Delegation Scheme attached at Appendix 1 to the attached report.
The fact that a function has been delegated to an officer does not require that officer to give the matter his/her personal attention and that officer may arrange for such delegation to be exercised by an officer of suitable experience and seniority.

Lead officer: Rachael Oakley


03/04/2014 - Waiver of Contracts' Procedure Rules 8.1 and 8.2 to enable Children's Services to enter into contracts with the Institute of Education and the University of York from 27th March 2014 to 31st March 2015, with an option to extend for a further 12 month ref: 41065    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 03/04/2014

Effective from:

Decision:

The Chief Officer of Children's Social Work approved the waiver of the following Contracts Procedure Rule(s):
Contracts Procedure Rules No. 8.1 and 8.2 - Intermediate value procurements and award contracts to Insitute of Education and the University of York in the sum of £25,000. The contract shall commence on the 27th March 2014 and expire on the 31st March 2015 (with the option to extend for a period of 12 months, for a further £25,000, such option not to be taken up more than twice).

Wards affected: (All Wards);

Lead officer: Mary Brittle


03/04/2014 - 4 Bawn Vale Farnley Leeds LS12 ref: 41064    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 03/04/2014

Effective from:

Decision:

The Chief Asset Management and Regeneration Officer has given approval to acquire the site of 4 Bawn Vale Farnley Leeds LS12 by negotiation, at auction or by using CPO powers .

Wards affected: Farnley and Wortley;

Lead officer: Mike Ross


03/04/2014 - 7 Manor Farm Green, Belle Isle, Leeds LS10 3RL ref: 41063    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 03/04/2014

Effective from:

Decision:

The Chief Asset Management and Regeneration Officer has approved the terms for the acquisition of the house at 7 Manor Farm Green.

Wards affected: Middleton Park;

Lead officer: Karen Hocker


03/04/2014 - Land to rear of 20-26 Queen Square, Leeds, LS2 8AF ref: 41062    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 03/04/2014

Effective from:

Decision:

The Chief Asset Management and Regeneration Officer has given approval to declare land to the rear of 20-26 Queen Square, Leeds, surplus to the Council’s requirements and to approve terms, as outlined in the confidential appendix of this report, for its sale on a one to one basis to the adjoining owner.

Wards affected: City and Hunslet;

Lead officer: James Child


03/04/2014 - Land at Thorpe Square, Thorpe Road, Throstle Terrace and Towcester Avenue, Middleton, Leeds, LS10 ref: 41061    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 03/04/2014

Effective from:

Decision:

The Chief Asset Management and Regeneration Officer has confirmed that the subject sites are surplus to the requirements of the Council and approves the invitation of offers for their sale on the open market for housing development, with any offers received being reported back for consideration.

Wards affected: Middleton Park;

Lead officer: Mike Ross


03/04/2014 - 12 Broom Mount, Leeds LS10 3LN ref: 41059    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 03/04/2014

Effective from:

Decision:

The Chief Asset Management and Regeneration Officer has approved the terms for the acquisition of the house at 12 Broom Mount.

Wards affected: Middleton Park;

Lead officer: Karen Hocker


11/04/2014 - Approval of city-wide crime prevention contract 2014-2017 ref: 41060    

Awarding of the contracts for the youth crime commission.

Decision Maker: Director of Children's Services

Decision published: 03/04/2014

Effective from: 23/04/2014

Decision:

The Director of Children’s Services agreed to approve the award of the Youth Inclusion Commission contract to Barca-Leeds as the lead practitioner in partnership with Nacro at a maximum cost of £500k per annum. The contract length will be 2 years and 8 months, with the option to extend for a period of up to 12 months.

Wards affected: (All Wards);

Lead officer: Louise Atherton


02/04/2014 - Annual Review of Parish and Town Council Charter ref: 41050    Recommendations Approved

Decision Maker: City Solicitor

Decision published: 02/04/2014

Effective from:

Decision:

The City Solicitor approved the updated Parish and Town Council Charter, following the annual review.

Wards affected: (All Wards);

Lead officer: Andrea Holgate


10/04/2014 - ICT Services Essential Services Programme - Corporate Hardware Upgrades ref: 41044    

To approve capital expenditure of £1.1M on essential corporate ICT hardware upgrades for 2014/15.  This principally incorporates important data centre improvements, the refresh of old end user devices, the replacement of aging server technology and the replacement of end of life network switches. This includes the human resources effort to install and commission.

 

Decision Maker: Deputy Chief Executive

Decision published: 02/04/2014

Effective from: 18/04/2014

Decision:

The Deputy Chief Executive has given approval to incur capital expenditure of £1.1M on essential corporate ICT hardware upgrades for 2014/15.  This principally incorporates the replacement of some of our aging Cisco network switches and refreshing elements of our MS Windows virtual server farm.  Decommissioning the 3rd floor Civic datacentre and refreshing old end of life ‘end user’ devices.  This programme involves the engagement of internal and external resources and the associated project management to implement this business critical hardware.

Lead officer: David Maidment


10/04/2014 - ICT Services Essential Services Programme - Corporate Software Upgrades ref: 41045    

To approve capital expenditure of £3.1M on essential corporate ICT software upgrades for 2014/15.  This principally incorporates important elements of software e.g. old and unsupported desktop software, website and intranet development, central server software upgrades, essential development and testing tools, mobile device management and security. This includes the human resources effort to install and commission.

 

Decision Maker: Deputy Chief Executive

Decision published: 02/04/2014

Effective from: 18/04/2014

Decision:

The Deputy Chief Executive has given approval to incur capital expenditure of £3.1M on essential corporate ICT software upgrades for 2014/15.  Microsoft Office Communicator will be upgraded from v2007 to MS Lync 2013. Important Website and Intranet developments. Upgrade MS Windows Server and MS SQL Server to v2012. Oracle upgrade to v.11g.  Upgrade general software e.g. MS Internet Explorer, Adobe Reader, Visio, MS Project.  Develop a Windows 8.1 image for trial on tablet devices and mobile phones.  Upgrade the core software used to develop and support our internal systems i.e. MS Team Foundation Server, Application Lifecycle Manager, Web Development Tools, Visual Studio 2013. Smartphone and ‘Bring Your Own Device’ device software management will also be upgraded.  Important IT Testing tools will be introduced.  This involves the engagement of internal and external resources and the associated project management to implement this business critical software.

Lead officer: David Maidment


01/04/2014 - Contract with Mandant Solutions Limited for the provision of SAP DBA support for the ESS/MSS project. ref: 41043    Recommendations Approved

Decision Maker: Deputy Chief Executive

Decision published: 01/04/2014

Effective from:

Decision:

Approval to waive Contract Procedure Rules 8.1 and 8.2 and enter into contract with Mandant Solutions Limited for the provision of SAP DBA support for the ESS/MSS project.

Lead officer: Bev Fisher


01/04/2014 - Award of HIV prevention and community testing contract (Lot 1) Black African communities and (Lot 2) for men who have sex with men ref: 41042    Recommendations Approved

Decision Maker: Director of Public Health

Decision published: 01/04/2014

Effective from:

Decision:

To seek approval from the Director of Public Health to award a contract to Black Health Agency for Lot 1 (Black African communities) of the HIV prevention and community testing service.

To seek approval from the Director of Public Health to award Yorkshire MESMAC a contract for Lot 2 (Men that have Sex with Men) of the HIV prevention and community testing service.

Wards affected: (All Wards);

Lead officer: Brenda Fullard


01/04/2014 - Designation of the Holbeck Neighbourhood Forum ref: 41041    Recommendations Approved

Decision Maker: Chief Planning Officer

Decision published: 01/04/2014

Effective from:

Decision:

The Chief Planning Officer has authorised the designation of the Holbeck Neighbourhood Forum pursuant to Section 61F of the Town and Country Planning Act 1990.

Wards affected: Beeston and Holbeck;

Lead officer: Ian Mackay


31/03/2014 - CityConnect Project - 20mph Zones ref: 41040    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer (Highways and Transportation):

i) noted the contents of this report;

ii) gave authority to advertise a series of Speed Limit Orders for the provision of a number of 20mph zones as shown on drawings TM-00-CSH-HB-01 to 04, any unresolved objections will be reported to Highways and Transportation Board;

iii) gave authority to advertise a notice under the provisions of Section 90C of the Highways Act 1980 notifying of the proposed traffic calming features as per the detailed design, any unresolved objections will be reported to Highways and Transportation Board;

iv) gave authority to advertise a Traffic Regulation Order to introduce no stopping restrictions as per detailed design, any unresolved objections will be reported to Highways and Transportation Board;

v) Instructed the City Solicitor to:

a) advertise the draft Traffic Regulation Order and Speed Limit Order as per the detailed design, any unresolved objections will be reported to Highways and Transportation Board; and

b) advertise all scheme related notices under the provisions of Section 90C of the Highways Act 1980 notifying of the proposed traffic calming features as per the detailed design, any unresolved objections will be reported to Highways and Transportation Board.

Wards affected: Armley; Bramley and Stanningley; Burmantofts and Richmond Hill; Calverley and Farsley; City and Hunslet; Cross Gates and Whinmoor; Farnley and Wortley; Gipton and Harehills; Hyde Park and Woodhouse; Killingbeck and Seacroft; Pudsey; Temple Newsam;

Lead officer: David O'Donoghue


31/03/2014 - Rental Support request for Ebor Gardens Community Centre ref: 41039    Recommendations Approved

Decision Maker: Assistant Chief Executive (Citizens and Communities)

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer Communities approves the rental support grant of £20,061.21 for 39 weeks of lettings at Ebor Gardens Community Centre for Ebor Gardens Primary School until 31st March 2015.

Wards affected: Burmantofts and Richmond Hill;

Lead officer: Sarah May


31/03/2014 - Friends of Drighlington Community Library request for Community Subsidised Accommodation ref: 41038    Recommendations Approved

Decision Maker: Assistant Chief Executive (Citizens and Communities)

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer Communities approves a grant to the Friends of Drighlington Community Library to the value of £1,860 and waives the notional £5,000 rental income. This grant is to cover the service charges for a 12 month period from 1st April 2014. This grant is approved on the condition that the Friends of Drighlington Library
sign the lease that has been drawn up. This support will be reviewed in 12 months to determine whether the arrangement should continue and to agree future conditions of use.

Wards affected: Morley North;

Lead officer: Aretha Hanson


31/03/2014 - Rental support for Leased out community centres 2014-15 ref: 41037    Recommendations Approved

Decision Maker: Assistant Chief Executive (Citizens and Communities)

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer Communities approves a rental support programme for
leased-out community centres for 2014/15 of up to a total of £179,017 as set out in the associated report, on the condition that agreed and signed leases are in place for all organisations concerned.

Wards affected: Ardsley and Robin Hood; Beeston and Holbeck; Bramley and Stanningley; Chapel Allerton; Farnley and Wortley; Garforth and Swillington; Guiseley and Rawdon; Kippax and Methley; Middleton Park; Wetherby;

Lead officer: Jonathan Sharp


31/03/2014 - Contract waiver and invocation of the Contracts Procedure Rule(s) in order to enter inro contracts with organisations for the delivery of services commissioned by Children's Services from April 2014 ref: 41036    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 31/03/2014

Effective from:

Decision:

The Director of Children's Services is requested to approve the waiver and invocation of the Contract Procedure Rules as detailed in Appendix 1 of this report to enter into contracts with the organisations as detailed within Appendix 2 attached to the report.

Wards affected: (All Wards);

Lead officer: Paul Bollom


31/03/2014 - Extension of contract LCC12000 Construction Services Managed Stores for 12 months ref: 41035    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer Property and Contracts (Housing Leeds) in consultation with the Chief Procurement Officer approved a waiver of CPR 9.1 and agreed to a twelve months extension of LCC 12000 Construction Services Managed Stores arrangement from 1st February 2014 to 31st March 2015

Wards affected: (All Wards);

Lead officer: Tony Butler


31/03/2014 - Price Review at Transfer Stations (Kirkstall Road & East Leeds) ref: 41033    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer Waste Management has agreed the reviewed prices charged for the disposal of general and recyclable waste at the City’s transfer stations

Wards affected: (All Wards);

Lead officer: Elizabeth Behrens


31/03/2014 - Waiver Report for Cycle Hoops Car Bike Ports Capital Scheme Number : 32017 / 000 / 000 ref: 41032    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer of Highways and Transportation:
i) noted the contents of this report; and

ii) approved the waiver of Contract Procurement Rule No 8.1 and 8.2 – Intermediate value procurements to allow Leeds City Council to appoint Cycle Hoop to supply 16 no. Car Bike Ports without request for quotes to competitors, and approve the supply of these at a cost of £64,974.


Wards affected: City and Hunslet;

Lead officer: Mark Robinson


31/03/2014 - City Connect Cycle Parking Scheme Capital Scheme Number : 32017 / 000 / 000 ref: 41031    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 31/03/2014

Effective from:

Decision:

The Chief Officer of Highways and Transportation:
i) noted the contents of this report;
ii) approved the supply of 16 Car Bike Ports at a cost of £64,974
iii) approved installation and supply of Sheffield Stands and installation of Car Bike Ports, by Leeds City Council’s own Highways Maintenance Team, at the locations shown on drawings CC-716969-CCCP-01, 02 and 03 included in Appendix A and in Appendix C at cost of £36,560; and
iv) gave authority to incur total expenditure of £106,534, comprising £101,534 works costs ( as detailed above ), and £5,000 internal staff fee costs, fully funded from the LTP Transport Policy Capital Programme.

Wards affected: City and Hunslet;

Lead officer: Mark Robinson


31/03/2014 - Extending the Independent Person Service Contract to RR Consultancy ref: 41034    Recommendations Approved

Decision Maker: Director of Adult Social Services

Decision published: 31/03/2014

Effective from:

Decision:

The Director of Adult Social Services, approved the extension of the Contract to RR Consultancy for an additional two years to 31st March 2016, as permitted within the current Contract.

Wards affected: (All Wards);

Lead officer: Judith Kasolo


27/03/2014 - Approval of a Care Plan over £100k ref: 41030    Recommendations Approved

Decision Maker: Director of Adult Social Services

Decision published: 27/03/2014

Effective from:

Decision:

The Chief Officer, Access and Care, approved the contents of a report regarding a care plan in respect of a person with complex care needs, the individual cost of which is up to £154,960 per annum. It is considered in the public interest that information contained in the report is exempt from publication as it relates to a vulnerable citizen of the City and the actions being taken to enable that person to live independently in a safe environment.

Lead officer: Michele Tynan


26/03/2014 - Authorisation of Commercial Transfer Agreement - Rothwell CofE (VC) Primary School from Leeds City Council to LEAF Academy Trust ref: 41029    Recommendations Approved

Decision Maker: Director of Children's Services

Decision published: 26/03/2014

Effective from:

Decision:

The Chief Officer, Strategy, Performance and Commissioning agreed to:
* note the negotiations held with solicitirs acting on behalf of the school, DfE and the Academy Trust; and
* give authority for the Commercial Transfer Agreement to be executed and completed to enable the Academy to open 1st April 2014.

Wards affected: Rothwell;

Lead officer: Nigel Wilson


26/03/2014 - Non-urgent Tree Works ref: 41028    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 26/03/2014

Effective from:

Decision:

The Director of Environment and Housing agreed to allocate £160k from the housing revenue account to address tree issues affecting health, wellbeing and quality of life.
To adopt the approach set out in paragraphs 3.8 and 3.9 as the basis of allocating spend against this allocation.

Wards affected: (All Wards);

Lead officer: Glen Gorner


25/03/2014 - Proposed demolition and compulsory purchase order,4 Bawn Vale and Refurbishment of 3 Bawn Vale, Leeds LS12 5QZ ref: 41026    Recommendations Approved

Decision Maker: Director of Environment and Housing

Decision published: 25/03/2014

Effective from:

Decision:

The Chief Officer of Property & investment agreed the Option to compulsory purchase land at 4 Bawn Vale, Leeds 12 under Section 17 of the Housing Act 1985. Completion of the demolition of 4 Bawn Vale, Leeds 12 and refurbishment of 3 Bawn Vale, Leeds 12. The other option which was to demolish both properties was not favoured due to the costs and reservations from Ward Members and local residents.

Wards affected: Farnley and Wortley;

Lead officer: Jeffrey Dembickjy


02/04/2014 - Disabled Facilities Grant budget 2014/15 ref: 41024    

The Director of Environment and Neighbourhoods approved the budget allocation for 2014/15

Decision Maker: Director of Environment and Housing

Decision published: 25/03/2014

Effective from: 10/04/2014

Decision:

Disabled Facilities Grant Budget 2014/15

Wards affected: (All Wards);

Lead officer: Rob McCartney


02/04/2014 - Housing Capital Programme specific schemes for 2014/15 - approval to spend ref: 41023    Recommendations Approved

The Director of Environments and Housing agreed to authorise expenditure of £64,413.3k for the delivery of the Council House Investment programme in 2014/15.

Note that within the programme there are existing commitments from 2013/14 which have slipped to 2014/15 which have ATS and are already on site and these total £9396.5k.

Note that the 2014/15 Sanctuary scheme £200k will be presented to Housing Decision Panel in March.

 

Decision Maker: Director of Environment and Housing

Decision published: 25/03/2014

Effective from: 10/04/2014

Decision:

HRA Council House Investment Programme 2014/15

Wards affected: (All Wards);

Lead officer: Steve Hunt


02/04/2014 - Housing Adaptations Contract Arrangements ref: 41025    For Determination

The Director of Environment and Housing approved the budget allocation for 2014/15

Decision Maker: Director of Environment and Housing

Decision published: 25/03/2014

Effective from: 10/04/2014

Decision:

Private Housing Adaptations (DFG) Contract Arrangements 2014/15

Wards affected: (All Wards);

Lead officer: Rob McCartney


24/03/2014 - Interim Extension of Contract – Highways and Transportation Partnership ref: 41022    Recommendations Approved

Decision Maker: Director of City Development

Decision published: 24/03/2014

Effective from:

Decision:

The Chief Officer (Highways and Transportation) approved the extension of the Highways and Transportation Partnership contract from 31st March 2014 to 30th June 2014.

Lead officer: Wynne Floyd


28/03/2014 - Extension of Interim residual waste contract. ref: 41010    

The Director of Environment and Housing for Waste Management has approved the extension of the existing contract which deals with the residual wastes collected from the kerbside of Leeds domestic properties subject to negotiations around price resulting in the same or better than current. The extension is to provide a continued outlet for this waste until the PFI Energy from waste facility is fully operational. (Currently scheduled for 2016)

Decision Maker: Director of Environment and Housing

Decision published: 20/03/2014

Effective from: 05/04/2014

Decision:

Extension of residual waste contract

Lead officer: Stephen Holmes


27/03/2014 - To seek authority for CEL (Property Maintenance and Corporate Property Management) to carry out a joint exercise with Housing Leeds (Construction Services) to Procure Housing and Non - Housing Sub - contractor Framework Contracts. ref: 41003    

This decision is to seek authority for CEL (Property Maintenance and Corporate Property Management) to carry out a series of joint procurement exercises with Housing Leeds (Construction Services) to procure contractors on framework contracts for a range of works and services to support the Council in the maintenance and small improvement works including refurbishment schemes for housing stock and public buildings. 

 

The procurement exercises will be carried in 5 distinct phases which will start January 2014 and contracts procured through phases 1 to 3 will commence January 2015, while phases 4 and 5 will commence April 2015.

Decision Maker: Deputy Chief Executive

Decision published: 19/03/2014

Effective from: 04/04/2014

Wards affected: (All Wards);

Lead officer: Michael Judge


27/03/2014 - Expanding the Section 75 and Pooled Funding Arrangement for Leeds Community Equipment Service ref: 41006    

Expansion of Pooled Budget and Section 75 Agreement between Leeds City Council, Leeds NHS Clinical Commissioning Groups and Leeds Community Healthcare for Leeds Community Equipment Service.

Decision Maker: Director of Adult Social Services

Decision published: 19/03/2014

Effective from: 04/04/2014

Decision:

The Deputy Director, Adult Social Care, approves the recommendations:

·  For the Director of Adult Social Services and the Director of Children’s Services to agree to develop and expand the pooled budget for Community Equipment Services to a total of £ £4,833,000 (as outlined in appendix 1). This is from within the existing budgets allocated by partners.

·  For the Director of Adult Social Services to agree that Adult Social Care be the Lead Commissioning Organisation and Pooled Fund holder.

·  For the Director of Adult Social Services to sign the Section 75 of the National Health Service Act 2006 agreement between Leeds City Council and Leeds NHS Clinical Commissioning Groups for the Commissioning of Community Equipment services.

·  For the Director of Adult Social Services to agree to develop and expand the partnership agreement with Leeds Community Healthcare for delivering Leeds Community Equipment Service, with Adult Social Care acting as lead provider.

·  For the Director of Adult Social Services to agree that these to come into effect from 1st April 2014 for three years till 31st March 2017. With a recognition that this arrangement may in future form part of the Better Care Fund for Leeds arrangements.

 

Wards affected: (All Wards);

Lead officer: Mick Ward


31/03/2014 - Extension of Contract - Highways and Transportation Partnership ref: 40967    

Approval to extend the Highways and Transportation Partnership Contract to the 30 September 2015.

Decision Maker: Director of City Development

Decision published: 14/03/2014

Effective from: 09/04/2014

Decision:

Extension of Contract  - Highways and Transportation Partnership

Wards affected: (All Wards);

Lead officer: Wynne Floyd


24/03/2014 - Framework contract for the supply of vehicles and specialised equipment with or without maintenance ref: 40964    

To award the framework contract for the supply of vehicles and specialised equipment with or without maintenance for a period of up to 4 years

Decision Maker: Deputy Chief Executive

Decision published: 14/03/2014

Effective from: 25/03/2014

Decision:

The Chief Officer, Civic Enterprise Leeds, approved the award for the

supply of vehicles with and without maintenance for 4 years with a contract start date of the 1st April 2014

Wards affected: (All Wards);

Lead officer: Carl Snowden


24/03/2014 - Authorisation to commence a procurement exercise for the Award of a Council Wide Frozen Food Contract ref: 40961    

The Chief Officer approved procurement exercise for the supply of frozen foods to Leeds City Council establishments. The contract will run for 3 years from 6th August 2014 to 5th August 2017 with one 12 month extension.

Decision Maker: Deputy Chief Executive

Decision published: 14/03/2014

Effective from: 02/04/2014

Decision:

The Chief Officer approved procurement exercise for the supply of frozen foods to Leeds City Council

Wards affected: (All Wards);

Lead officer: Gillian Banks


24/03/2014 - Road Markings Contract 2014 - 2018 ref: 40968    

Approval to tender a Road Markings Contract

Decision Maker: Director of City Development

Decision published: 13/02/2014

Effective from: 01/04/2014

Decision:

The Head of Engineering Services approved the tender of the Road Markings Maintenance Contract 2014/18.

Wards affected: (All Wards);

Lead officer: Richard Tinker